21
21
Section 2 - Stripe Hog Systems
frequently with clean, fresh water to prevent the
accumulation of debris that may accidently enter
the tank.
There is a 3” ball valve on the passenger side
bottom of the tank that allows for quick draining
of the tanks when flushing is required and com
-
plete draining for system winterization. A large
man-way hatch on the top of each tank provides
access to the interior of the tank for inspection or
to facilitate cleaning.
Use the sight gauge or actual blasting time during
operation with an average pump consumption of
5-6 gallons (16-23 liters) per minute to estimate
the remaining clean water in the tank.
Typical Clean Water Tank Configuration & Fill Connection
Clean Water Tank Drain Valve
CLEAN
WATER TANKS
SIGHT
GAUGE
FILL
CONNECTION
Clean Water Fill Fitting & Valve
Содержание SK5500
Страница 2: ......
Страница 80: ...80 NOTES...
Страница 135: ...135 Section 5 Scheduled Maintenance Hog Technologies...
Страница 141: ...141 Appendix 2 Tools Spare Parts...
Страница 142: ...142 Appendix 2 Tools Spare Parts...
Страница 143: ...143 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Страница 151: ...151 Appendix 4 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 68 Nozzle Calculation Sheet...
Страница 152: ...152 NOTES...
Страница 159: ......
Страница 160: ......