1. GETTING STARTED
1-2
1.4 Workflow
The following is the workflow of actions required before the equipment power is turned on.
See 1.6 Installation Environment.
See 1.7 Hardware Connections.
See 2.1 Before Turning On the Power.
For details about installing an extension board, see
6.3.4 Installing and removing an extension board.
Unpack this equipment
Install this equipment
Install extension boards
Turn on the power
Connect hardware
Содержание HF-W2000 50
Страница 37: ...C 12 This page is intentionally left blank ...
Страница 73: ...2 OPERATION 2 12 4 Click ACPI x64 based PC Microsoft ACPI Compliant System and PCI Express Root Complex ...
Страница 91: ...2 30 This page is intentionally left blank ...
Страница 147: ...This page is intentionally left blank ...
Страница 171: ...This page is intentionally left blank ...
Страница 183: ...This Page Intentionally Left Blank ...
Страница 211: ...This Page Intentionally Left Blank ...
Страница 250: ...10 SOFTWARE RAID1 10 7 Note In the RAS software the HDD and other auxiliary storage devices are generally called drives ...
Страница 286: ...10 SOFTWARE RAID1 10 43 Clicking Close redisplays the menu window ...