5.2 Connecting to the Lines to be Measured
81
5
Connect the voltage cords and clamp sensors to the lines to be mea-
sured. To ensure proper connections for correct measurements, look at
the wiring configuration diagram (p. 83) while making connections.
5.2
Connecting to the Lines to be Measured
• When measuring three-phase lines, make connections to the lines to
be measured in the same sequence as the measurement channesl
(channels 1, 2 and 3).
• Although this one instrument can measure various wiring configura-
tions from single-phase 2-wire to three-phase 4-wire, it cannot mea-
sure single-phase power in three different systems.
Connecting voltage cords to lines to be measured
Securely clip the leads to metal parts such
as load-side screw terminals or bus bars.
Example:
Secondary side of breaker
L9438-55 Voltage Cord
Содержание 3197
Страница 1: ...3197 POWER QUALITY ANALYZER May 2012 Revised edition 7 3197A981 07 12 05H Instruction Manual ...
Страница 2: ......
Страница 8: ...Contents vi ...
Страница 30: ...1 3 Measurement Flowchart 22 ...
Страница 44: ...2 5 Internal Operating Status and Memory Usage 36 ...
Страница 86: ...4 6 Initializing the Instrument System Reset 78 ...
Страница 117: ...6 3 Viewing Anomalous Phenomena EVENT screen 109 6 Viewing the INRUSH Screen DETAILS WAVEFORM INRUSH ...
Страница 134: ...6 4 Viewing Recorded Data REVIEW State 126 ...
Страница 139: ...7 2 Installing JRE 131 7 5 When the installation process has completed successfully click Finish Click ...
Страница 176: ...9 4 Disposing of the Instrument 168 ...
Страница 199: ......
Страница 200: ...3197 POWER QUALITY ANALYZER May 2012 Revised edition 7 3197A981 07 12 05H Instruction Manual ...