1.3 Measurement Flowchart
20
4
Confirming Instrument Settings and Connecting to the Lines to
be Measured
Before starting recording, confirm that the instrument's clock
shows the correct time. If not, set the clock (p. 76).
Note that correct clock setting is especially important when record-
ing start and end times are specified.
2
Select the appropriate wiring con-
figuration and clamp sensor model
settings (p. 81).
3
Confirm the correct connection
status (p. 86).
Confirm measurement values and vector
display.
Press
to
select Basic Setup,
and press
to
execute (p. 54).
Make the appropri-
ate settings for
measurement as
occasion demands
(p. 53).
Set measurement and
recording conditions
such as the recording
method (memory parti-
tioning and interval)
and event settings.
4
Advanced Setup
Make the required settings before
connecting (p. 57).
Select the appropriate wiring configura-
tion and clamp sensor model settings.
1
Basic Setup
measurement
values and vector
display
Содержание 3197
Страница 1: ...3197 POWER QUALITY ANALYZER May 2012 Revised edition 7 3197A981 07 12 05H Instruction Manual ...
Страница 2: ......
Страница 8: ...Contents vi ...
Страница 30: ...1 3 Measurement Flowchart 22 ...
Страница 44: ...2 5 Internal Operating Status and Memory Usage 36 ...
Страница 86: ...4 6 Initializing the Instrument System Reset 78 ...
Страница 117: ...6 3 Viewing Anomalous Phenomena EVENT screen 109 6 Viewing the INRUSH Screen DETAILS WAVEFORM INRUSH ...
Страница 134: ...6 4 Viewing Recorded Data REVIEW State 126 ...
Страница 139: ...7 2 Installing JRE 131 7 5 When the installation process has completed successfully click Finish Click ...
Страница 176: ...9 4 Disposing of the Instrument 168 ...
Страница 199: ......
Страница 200: ...3197 POWER QUALITY ANALYZER May 2012 Revised edition 7 3197A981 07 12 05H Instruction Manual ...