Installing gateway
33/95
Ø
Keep on pushing the gateway downwards and tilt it
back into vertical position, thereby hooking the
gateway into the lower railing.
Hook gateway to lower railing
Ø
Let go of the gateway. The spring inside the bolt
automatically pushes the gateway upwards into
the railings, thereby fixing the gateway to the top
hat rail.
Gateway is clamped to top hat rail
SmartWire-DT Gateway | EU5C-SWD-SERCOS
DOC160805UM01EN | Revision 1 | English | 2017-02 | Released | Public
© Hilscher 2017