13. Install the access panel (Installing the access panel).
14. Install the server into the rack (Installing the server into the rack).
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
18. Configure the new storage controller.
For more information, see the user guide for your controller series on the Hewlett Packard Enterprise website
(
http://www.hpe.com/info/smartstorage-docs).
Installing a FlexibleLOM adapter
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• The components included with the hardware option kit
• A T-10 Torx screwdriver might be needed to unlock the access panel.
Procedure
1.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Do one of the following:
Hardware options installation
121
Содержание HPE ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module Component identification 12...
Страница 106: ...Four processor configuration Hardware options installation 106...
Страница 161: ...Drive box 1 to butterfly riser cage Drive box 2 to primary riser cage 4 drive configuration Cabling 161...
Страница 163: ...Drive box 2 to 4 port mezzanine card Drive box 3 to primary 4 port riser Cabling 163...