HPE Smart Array MR Gen10 controller cabling
CAUTION: To avoid damage to the cables and server components, always route cables flat against the server walls,
and separate the cables as they enter the primary riser cage. Bundled cables can be pinched or damaged when
installing the fan cage or primary riser cage.
Controller backup power cable
Using the shorter of the two cables provided, connect the controller backup power cable to the controller backup power
connector on the riser board.
24-drive configuration
Cables from the lower drive box backplanes (boxes 4–6) are routed to the controller installed in the primary riser cage.
Cabling
169
Содержание HPE ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module Component identification 12...
Страница 106: ...Four processor configuration Hardware options installation 106...
Страница 161: ...Drive box 1 to butterfly riser cage Drive box 2 to primary riser cage 4 drive configuration Cabling 161...
Страница 163: ...Drive box 2 to 4 port mezzanine card Drive box 3 to primary 4 port riser Cabling 163...