
CAUTION: Do not operate the server for long periods with the access panel open or removed. Operating the
server in this manner results in improper airflow and improper cooling that can lead to thermal damage.
7.
8.
Select any available PCIe expansion slot that is x8 physical size and x4 electrical.
9.
Remove the expansion slot blank from the riser cage.
The primary PCIe riser cage is shown.
10. Install the boot device.
11. Install the riser cage.
12. Install the access panel (Installing the access panel).
13. Install the server into the rack (Installing the server into the rack).
14. Connect each power cord to the server.
Hardware options installation
114
Содержание HPE ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module Component identification 12...
Страница 106: ...Four processor configuration Hardware options installation 106...
Страница 161: ...Drive box 1 to butterfly riser cage Drive box 2 to primary riser cage 4 drive configuration Cabling 161...
Страница 163: ...Drive box 2 to 4 port mezzanine card Drive box 3 to primary 4 port riser Cabling 163...