a. Route the cables from the upper drive box backplanes (boxes 1–3) to the SAS expander card in the butterfly
riser cage.
b. Route the cables from the lower drive box backplanes (boxes 4–6) to the SAS expander card in the primary riser
cage.
12. Install the access panel (Installing the access panel).
13. Install the server into the rack (Installing the server into the rack).
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
Installing a GPU card
Up to four double wide GPU cards can be installed in the following locations:
Hardware options installation
109
Содержание HPE ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module Component identification 12...
Страница 106: ...Four processor configuration Hardware options installation 106...
Страница 161: ...Drive box 1 to butterfly riser cage Drive box 2 to primary riser cage 4 drive configuration Cabling 161...
Страница 163: ...Drive box 2 to 4 port mezzanine card Drive box 3 to primary 4 port riser Cabling 163...