◦
Use conductive field service tools.
◦
Use a portable field service kit with a folding static-dissipating work mat.
If you do not have any of the suggested equipment for proper grounding, have an authorized reseller install the part.
For more information on static electricity or assistance with product installation, contact an authorized reseller.
Server box contents
The server shipping box contains the following contents:
• A server
• A power cord
• Rack-mounting hardware (optional)
• Documentation
Installing the server into the rack
CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install the
heaviest item first, and continue to populate the rack from the bottom to the top.
CAUTION: To prevent damage to the rails, be sure to align and fully insert the server side rails into the rack rails
when installing the server in the rack.
Procedure
1. Install the server and cable management arm into the rack. For more information, see the installation instructions that
ship with the rack.
2. Connect peripheral devices to the server.
For information on identifying connectors, see
WARNING: To reduce the risk of electric shock, fire, or damage to the equipment, do not plug telephone or
telecommunications connectors into RJ-45 connectors.
3. Connect the power cord to the rear of the server.
CAUTION: Connect the power cords using only a supported configuration. Using an unsupported power supply
or cabling configuration can result in an unexpected loss of system power.
For information on cabling the power supplies for redundancy, see
Installing a hot-plug power supply.
4. Secure the cables to the cable management arm.
IMPORTANT: When using cable management arm components, be sure to leave enough slack in each of the
cables to prevent damage to the cables when the server is extended from the rack.
Setup
64
Содержание HPE ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module Component identification 12...
Страница 106: ...Four processor configuration Hardware options installation 106...
Страница 161: ...Drive box 1 to butterfly riser cage Drive box 2 to primary riser cage 4 drive configuration Cabling 161...
Страница 163: ...Drive box 2 to 4 port mezzanine card Drive box 3 to primary 4 port riser Cabling 163...