• Install power supplies into power supply bays 1—4.
• For redundancy, connect AC power from one power circuit to power supplies 1 and 2, and then connect power
supplies 3 and 4 to a separate AC power circuit.
For information on cabling the power supplies for redundancy, see
Installing a hot-plug power supply.
Installing a hot-plug power supply
CAUTION: All power supplies installed in the server must have the same output power capacity. Verify that all
power supplies have the same part number and label color. The system becomes unstable and may shut down
when it detects mismatched power supplies.
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all device bays are
populated with either a component or a blank.
IMPORTANT: HPE ProLiant Gen9 power supplies are not supported in HPE ProLiant Gen10 servers.
Procedure
1. Remove the blank.
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
2. Install the power supply until it clicks into place.
3. Connect the power cord to the power supply.
Hardware options installation
139
Содержание HPE ProLiant DL580 Gen10
Страница 11: ...Eight bay SFF NVMe drive cage Six bay SFF HDD Two bay NVMe SSD Premium drive cage Component identification 11...
Страница 12: ...Two bay SFF Premium drive cage Front panel LEDs and buttons Power switch module Component identification 12...
Страница 106: ...Four processor configuration Hardware options installation 106...
Страница 161: ...Drive box 1 to butterfly riser cage Drive box 2 to primary riser cage 4 drive configuration Cabling 161...
Страница 163: ...Drive box 2 to 4 port mezzanine card Drive box 3 to primary 4 port riser Cabling 163...