9
Boiler control
42
Table 9. 1: Operation mode "Screed drying"
Bake out day
Flow set
temperature in
°C
If screed drying gets interrupted, resume
drying as follows:
1
25
Day of interruption
resume from day
2
30
0
– 15
1
3
35
16
16
4
40
17
– 23
17
5
– 12
45
24
– 28
24
13
40
29
29
14
35
15
30
16
25
17
– 23
10
24
30
25
35
26
40
27
45
28
35
29
25
30
0
figure 9. 3 : Flow m
ust temperature in dependence of the bake out days at „Screed drying”
F
low
mu
st t
emp
er
atu
re
°C]
bake out days
Содержание firestar de Luxe 18
Страница 1: ...OPERATING INSTRUCTIONS Log wood boiler firestar de Luxe 18 40 ...
Страница 18: ...8 Temperature manager 18 Fig 8 6 Example temperature manager when time mode without difference ...
Страница 80: ...16 Annex 80 16 ANNEX 16 1 Additional boiler module Hydraulic recommendation 1 ...
Страница 81: ...Annex 16 81 Hydraulic recommendation 2 ...
Страница 82: ...16 Annex 82 16 2 Solar module Program 1 ...
Страница 83: ...Annex 16 83 Program 2 ...
Страница 84: ...16 Annex 84 Program 3 ...
Страница 85: ...Annex 16 85 Program 4 ...
Страница 86: ...16 Annex 86 Program 5 ...
Страница 87: ...Annex 16 87 Program 6 ...
Страница 88: ...17 Notes 88 17 NOTES ...
Страница 89: ...Notes 17 89 ...