ASSEMBLY AND ANCHORING
6-23
MSHF • 7295-026A
Fig.6-44 Brake lever drive unit
Fig.6-45 Autolevel switches
6.9
Checking the autolevel switches
For a twin mast construction, the autolevel
switches must be checked and adjusted if
necessary.
1.
Raise the platform by 3 metres /
9.8 ft and level the platform by means
of the brake lever.
2.
Operate the brake release on one
drive unit and, depending on the
distance between the centres of the
masts, allow the unit to descend.
Distance between centres 730 cm /
24 ft : 25,5 cm / 10.0 in lower.
Distance between centres 1330 cm /
43.6 ft: 46 cm / 18.1 in lower.
These distances represent a platform
slope of 2 degrees.
3.
Operate the "UP" push-button on the
platform. The lowest unit must now be
the first to rise.
4.
Repeat the previous steps for the
other unit.
5.
If necessary, adjust the switches.
Содержание MSHF
Страница 1: ...7295 026A Issue 02 2000 USER S MANUAL MSHF MAST CLIMBING WORK PLATFORM This manual is assigned to...
Страница 4: ...IV MSHF 7295 026A...
Страница 10: ...X MSHF 7295 026A Fig 1 Dimensions...
Страница 14: ...TECHNICAL DETAILS 1 4 MSHF 7295 026A Fig 1 6 Drive unit...
Страница 16: ...TECHNICAL DETAILS 1 6 MSHF 7295 026A Fig 1 7 Chassis Fig 1 8 Ground frame...
Страница 30: ...SAFETY 3 4 MSHF 7295 026A...
Страница 70: ...DISASSEMBLY AND TRANSPORT 8 4 MSHF 7295 026A...
Страница 80: ...MACHINE DISPOSAL 11 2 MSHF 7295 026A...
Страница 83: ...APPENDICES 1 MSHF 7295 026A...
Страница 84: ...APPENDICES 2 MSHF 7295 026A...