TECHNICAL DETAILS
1-10
MSHF • 7295-026A
1.7
Loading of the mast climbing
work platform
1.7.1 Outriggers chassis
The outriggers of the chassis can be placed and locked in different positions. The
maximum free standing height of the mast climbing work platform is also depended on
the position of the outriggers.
Fig.1-9
Outrigger locking
Position of the locking pin
Position of the outriggers
1
2
3
4
Maximum
freestanding
mast height
X -position front
A
A
A
A
20 m
65.6 ft
X -position back
A
A
A
A
20 m
65.6 ft
½K -position front
A
A
B
B
15 m
49.2 ft
½K -position back
B
B
A
A
15 m
49.2 ft
K -position front
A
A
C
C
7.5 m
24.6 ft
K -position back
C
C
A
A
7.5 m
24.6 ft
Содержание MSHF
Страница 1: ...7295 026A Issue 02 2000 USER S MANUAL MSHF MAST CLIMBING WORK PLATFORM This manual is assigned to...
Страница 4: ...IV MSHF 7295 026A...
Страница 10: ...X MSHF 7295 026A Fig 1 Dimensions...
Страница 14: ...TECHNICAL DETAILS 1 4 MSHF 7295 026A Fig 1 6 Drive unit...
Страница 16: ...TECHNICAL DETAILS 1 6 MSHF 7295 026A Fig 1 7 Chassis Fig 1 8 Ground frame...
Страница 30: ...SAFETY 3 4 MSHF 7295 026A...
Страница 70: ...DISASSEMBLY AND TRANSPORT 8 4 MSHF 7295 026A...
Страница 80: ...MACHINE DISPOSAL 11 2 MSHF 7295 026A...
Страница 83: ...APPENDICES 1 MSHF 7295 026A...
Страница 84: ...APPENDICES 2 MSHF 7295 026A...