ASSEMBLY AND ANCHORING
6-2
MSHF • 7295-026A
6.1
Preparation for assembly
Ensure that the site where the
mast climbing work platform will
be assembled accords with the
national requirements and that
permission has been obtained
from the relevant authorities for
the assembly.
- Ensure that a suitable power supply,
good lighting, lifting equipment and tools
are available.
- Ensure that the building site is easily
accessible to the vehicle which will
deliver the mast climbing work platform.
- Prepare the site with suitable support
and anchoring facilities.
- Ensure that the position where the mast
climbing work platform will stand has
good drainage.
- Plan the positioning of the mast
climbing work platform so that where the
mast needs to be anchored, it can be so
anchored with the standard material.
- The components of the mast climbing
work platform mast should be placed as
close as possible to the place where it
will be assembled.
- The electrical power supply connection
must be placed as close to the mast
climbing work platform as possible so
as to reduce the voltage drop to a
minimum. If the voltage reduction is too
great the machine may not function
correctly.
Содержание MSHF
Страница 1: ...7295 026A Issue 02 2000 USER S MANUAL MSHF MAST CLIMBING WORK PLATFORM This manual is assigned to...
Страница 4: ...IV MSHF 7295 026A...
Страница 10: ...X MSHF 7295 026A Fig 1 Dimensions...
Страница 14: ...TECHNICAL DETAILS 1 4 MSHF 7295 026A Fig 1 6 Drive unit...
Страница 16: ...TECHNICAL DETAILS 1 6 MSHF 7295 026A Fig 1 7 Chassis Fig 1 8 Ground frame...
Страница 30: ...SAFETY 3 4 MSHF 7295 026A...
Страница 70: ...DISASSEMBLY AND TRANSPORT 8 4 MSHF 7295 026A...
Страница 80: ...MACHINE DISPOSAL 11 2 MSHF 7295 026A...
Страница 83: ...APPENDICES 1 MSHF 7295 026A...
Страница 84: ...APPENDICES 2 MSHF 7295 026A...