ASSEMBLY AND ANCHORING
6-17
MSHF • 7295-026A
6.5
Anchoring the mast
If work must be stopped, always
complete the current phase
before stopping. Tighten all the
bolts for the latest fixture and
secure the main switch so that
the mast climbing work platform
cannot be operated.
Before starting to fix any
anchors, ensure that the chassis/
ground frame is level.
The wall must be of such a
quality that it can accept the
forces applied to it via the
anchors.
The platform extensions and the
anchors must not come into
contact during raising and
lowering.
The anchor forces must be
approved by the owner or the
person responsible for the
building to which the machine will
be anchored.
1.
Check that the mast is vertical with a
spirit level at least 1 metre / 40 inch
long. Recheck as each anchor is
secured.
2.
The mast must be anchored to the
building at the distances specified in
the table in chapter 1.
3.
The anchors are assembled from
mast adapters, horizontal anchor
tubes and a support tube.
Содержание MSHF
Страница 1: ...7295 026A Issue 02 2000 USER S MANUAL MSHF MAST CLIMBING WORK PLATFORM This manual is assigned to...
Страница 4: ...IV MSHF 7295 026A...
Страница 10: ...X MSHF 7295 026A Fig 1 Dimensions...
Страница 14: ...TECHNICAL DETAILS 1 4 MSHF 7295 026A Fig 1 6 Drive unit...
Страница 16: ...TECHNICAL DETAILS 1 6 MSHF 7295 026A Fig 1 7 Chassis Fig 1 8 Ground frame...
Страница 30: ...SAFETY 3 4 MSHF 7295 026A...
Страница 70: ...DISASSEMBLY AND TRANSPORT 8 4 MSHF 7295 026A...
Страница 80: ...MACHINE DISPOSAL 11 2 MSHF 7295 026A...
Страница 83: ...APPENDICES 1 MSHF 7295 026A...
Страница 84: ...APPENDICES 2 MSHF 7295 026A...