ASSEMBLY AND ANCHORING
6-18
MSHF • 7295-026A
4.
The horizontal anchor tubes and the
support tubes can be supplied in
various lengths.
5.
Fixing the anchors:
- Anchoring is carried out using bolt
couplings, nut and bolt fastenings
and washers. If conditions make it
necessary, use may be made of
other approved attachment
materials which are suitable for the
forces present. (Consult your
dealer).
- Cemented-in anchors must be
allowed to become fully secure
(the cement must have time to
harden) before the mast climbing
work platform is assembled. The
cement or concrete used must be
in accord with the specifications.
- If chemical anchors or expansion
bolts are used, these must be
approved and must be able to
withstand the forces involved.
- Specifications for these types of
bolts are available from the
supplier. Permission to use them
must be obtained from the local
authorities.
Содержание MSHF
Страница 1: ...7295 026A Issue 02 2000 USER S MANUAL MSHF MAST CLIMBING WORK PLATFORM This manual is assigned to...
Страница 4: ...IV MSHF 7295 026A...
Страница 10: ...X MSHF 7295 026A Fig 1 Dimensions...
Страница 14: ...TECHNICAL DETAILS 1 4 MSHF 7295 026A Fig 1 6 Drive unit...
Страница 16: ...TECHNICAL DETAILS 1 6 MSHF 7295 026A Fig 1 7 Chassis Fig 1 8 Ground frame...
Страница 30: ...SAFETY 3 4 MSHF 7295 026A...
Страница 70: ...DISASSEMBLY AND TRANSPORT 8 4 MSHF 7295 026A...
Страница 80: ...MACHINE DISPOSAL 11 2 MSHF 7295 026A...
Страница 83: ...APPENDICES 1 MSHF 7295 026A...
Страница 84: ...APPENDICES 2 MSHF 7295 026A...