ASSEMBLY AND ANCHORING
6-6
MSHF • 7295-026A
9.
Mount the steps and secure them
with locking pins.
10.
Mount the fencing and secure it with
"hairpins".
11.
Mount the gate and the cam for the
gate safety switch. The roller must fall
into the cam when the gate is closed
6.3.2 Mast climbing work platform with
one mast on a ground frame
1.
Position the ground frame parallel to
the wall.
2.
Place the ground supports.
3.
Level the machine using the jacks.
Ensure that the mast is vertical in
both directions by checking with a
spirit level (with a length of at least 1
metre / 40 inch) placed against two
adjacent sides of the mast. Place
wooden packing under the machine
to provide optimum load spreading
and stability.
Fig.6-9
Step
Fig.6-10 Fence
Fig.6-11 Gate safety switch
Fig.6-8
Lower striker plate
Содержание MSHF
Страница 1: ...7295 026A Issue 02 2000 USER S MANUAL MSHF MAST CLIMBING WORK PLATFORM This manual is assigned to...
Страница 4: ...IV MSHF 7295 026A...
Страница 10: ...X MSHF 7295 026A Fig 1 Dimensions...
Страница 14: ...TECHNICAL DETAILS 1 4 MSHF 7295 026A Fig 1 6 Drive unit...
Страница 16: ...TECHNICAL DETAILS 1 6 MSHF 7295 026A Fig 1 7 Chassis Fig 1 8 Ground frame...
Страница 30: ...SAFETY 3 4 MSHF 7295 026A...
Страница 70: ...DISASSEMBLY AND TRANSPORT 8 4 MSHF 7295 026A...
Страница 80: ...MACHINE DISPOSAL 11 2 MSHF 7295 026A...
Страница 83: ...APPENDICES 1 MSHF 7295 026A...
Страница 84: ...APPENDICES 2 MSHF 7295 026A...