4 Planning and installation – Delivery system
55
I
NSTALLING
THE
EMD-C 215 E
XCLUSIV
CONTROL
CABINET
Observe the following when installing the EMD-C 215 Exclusiv con-
trol cabinet:
•
The HDG Compact 99 - 200 heating system is supplied with a 10 m
cable for connecting the boiler with the control cabinet. Install the
control cabinet within range of the connection cable.
•
Install the control cabinet at least one metre from the flue pipe.
•
Prevent the control cabinet from tipping by fixing it to the wall se-
curely.
•
If possible, install the control cabinet in such a way that you can
see boiler when operating the control panel of HDG Control.
•
Install the control cabinet at a height comfortable for you to ope-
rate.
C
ONNECTING
THE
CHIMNEY
✎
See section “4.2 Connections” in this chapter.
1. Connect the flue pipe to the chimney connection or with the HDG
cyclone dust extractor.
2. Make sure that the connecting piece does not protrude into the
chimney.
3. Seal the connection to the chimney with highly fireproof silicone
or with a suitable mortar.
✓
The boiler is now connected to the chimney.
4.5 Delivery system
G
ENERAL
INFORMATION
The description for planning, installation and operation of the em-
ployed delivery system can be found in the corresponding operating
manual.
✎
See the operating manual, "Delivery system".
Warning!
Danger of injury
The control cabinet is heavy. Hands and feet could be crushed du-
ring installation.
Содержание Compact 100
Страница 1: ...hdg bavaria com HDG Compact 99 200 Operation Manual ...
Страница 2: ......
Страница 162: ...12 Index 162 HDG Compact 100 105 150 200 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Страница 163: ......