4 Planning and installation – Installing the heating system
51
✓
Grasp the clamp handles and tighten the ash containers solidly on
the ash removal door.
5. Close the ash containers in the reverse sequence.
✓
The ash containers are mounted and adjusted.
A
SH
CONTAINER
140
L
I
NSTALLING
THE
CENTRAL
ASH
REMOVAL
SYSTEM
1. Remove the cover from the
ash container.
2. Release the external nuts on
the ash container.
3. Adjust the ash container with
the interior nuts (1) until the
clamping handles latch firmly.
4. Screw on the nuts and check
that the clamp handles clamp
firmly.
Figure 4/19 - Adjusting the ash containers
1
Optionally, for the HDG Compact 99 - 200 heating system 140 l ash
containers can be installed instead of 80 l ash containers.
Installation and adjustment is performed in the same way as with
the 80 l ash containers.
Figure 4/20 - Ash container 140 l
For the HDG Compact 99 - 200 heating system, a central ash re-
moval system is optionally available for delivering the combustion
ash and fly ash to a 240 l ash bin.
Содержание Compact 100
Страница 1: ...hdg bavaria com HDG Compact 99 200 Operation Manual ...
Страница 2: ......
Страница 162: ...12 Index 162 HDG Compact 100 105 150 200 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Страница 163: ......