SupervisorMode
98
A4500-1.1
HBM: public
WTX120
10.2.12.2
Fine2
Before the start of the coarse flow phase the fine flow is first activated for a
short time. Then Fine flow is activated for the coarse flow phase.
When the coarse flow limit value (CBK) is reached the coarse flow is deacti
vated. If opening occurs in the fine flow phase, such as during re-dosing (pa
rameter P1 > 0), or when starting from a stop, only the fine flow is activated.
This priority fine flow serves to minimize foaming of the fill material.
Coarse flow
Fine flow
Start
Start
Time
Time
OFF
OFF
ON
ON
Coarse flow cut-
off point
Fine flow cut-
off point
Fig. 11.5
Fill cycle with Fine2 valve control
Coarse flow
Fine flow
Start
Time
Time
Off
Off
On
On
Fine flow cut-
off point
Coarse flow cut-
off point
First fine flow phase
before coarse flow
Fig. 11.6
Fill cycle with Fine2 valve control with first fine flow phase activated
(see also chapter 10.2.27)
Содержание WTX120
Страница 1: ...Operating Manual Bedienungsanleitung Manuel d emploi English Deutsch Français WTX120 ...
Страница 3: ...Operating Manual Bedienungsanleitung Manuel d emploi English Deutsch Français WTX120 ...
Страница 184: ...Service password 182 A4500 1 1 HBM public WTX120 ...
Страница 185: ...Operating Manual Bedienungsanleitung Manuel d emploi English Deutsch Français WTX120 ...
Страница 366: ...Service Passwort 182 A4500 1 1 HBM public WTX120 ...
Страница 367: ...Operating Manual Bedienungsanleitung Manuel d emploi English Deutsch Français WTX120 ...
Страница 549: ...Mot de passe de service WTX120 A4500 1 1 HBM public 183 ...