133
4000511390
E03.16 USA
/
GB
Chassis and turntable
Overload system
MS0017
Chassis and turntable
Overload system
1 - You will need
2 - Preliminary operation
The operations of disassembling if they exist should be carried out only on the installations completely disconnected
and must be entrusted only to people having the necessary technical training.
Respect, in addition to the instructions appearing in the present instructions, the legal tendencies generally applicable
for safety accident prevention.
All the precautions must be done in work before intervening on and near the machine.
After completion of work, all the covers and safety devices must be positioned back completely and operational.
3 - Periodic inspection
To test the function :
• Put the machine in lower position on flat ground.
• Select turret control box using the key selector.
• Turn the load selector ( 82 ) on position 250 kg (550 lbs).
• Level the platform if needed.
• Put a load of 300 kg (662 lb) in the center of the platform (as drawn below), using adequat tools.
• Verify that audible and visual warning device are actuated.
• Standard tool kit
• Protective goggles
• Gloves
• Place barriers around the perimeter of the work area
If not, overload system setting is needed. Do not use the machine. Refer to maintenance book for operation setting.
Содержание HT21RT O
Страница 86: ...86 4000511390 E03 16 USA GB General data Breaking test procedure MS0004 Notes...
Страница 94: ...94 4000511390 E03 16 USA GB Chassis and turntable Tires Tyres and pressures Wheel replacement MS0006 Notes...
Страница 106: ...106 4000511390 E03 16 USA GB Chassis and turntable Gearbox inspection Oil replacement MS0011 Notes...
Страница 132: ...132 4000511390 E03 16 USA GB Chassis and turntable KUBOTA diesel engine MS0029 Notes...
Страница 142: ...142 4000511390 E03 16 USA GB Chassis and turntable Overload system MS0017 Notes...
Страница 160: ...160 4000511390 E03 16 USA GB Chassis and turntable Dismantling Reassembling wheels reducer MS0026 Notes...
Страница 184: ...184 4000511390 E03 16 USA GB Upper boom Procedure of dismantling reassembling telescope cylinder MS0014 Notes...
Страница 188: ...188 4000511390 E03 16 USA GB Upper boom Boom adjustment procedure MS0015 Notes...
Страница 192: ...192 4000511390 E03 16 USA GB Upper boom Boom angle sensor adjustment MS0018 Notes...
Страница 222: ...222 4000511390 E03 16 USA GB Hydraulics Hydraulic oil Level Replacement MS0019 Notes...
Страница 231: ...231 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 233: ...233 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 235: ...235 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 237: ...237 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 239: ...239 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Страница 240: ...240 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Страница 242: ...242 4000511390 E03 16 USA GB Electric Electrical wiring MS0025 Notes...