120
4000511390
E03.16 USA
/
GB
Chassis and turntable
KUBOTA diesel engine
MS0029
4.3 - RADIATOR
Coolant will last for one day's work if filled all the way up before operation start. Make it a rule to check the coolant
level before every operation.
4.3.1 - Checking coolant level, adding coolant
To avoid personal injury :
• Do not stop the engine suddenly, stop it after about 5 minutes of unloaded idling.
• Work only after letting the engine and radiator cool off completely (more than 30 minutes after it has been stopped).
• Do not remove the radiator cap while coolant is hot. When cool to the touch, rotate cap to the first stop to allow excess
pressure to escape. Then remove cap completely.
• If overheats should occur, steam may gush out from the radiator or recovery tank; Severe burns could result.
1.
Remove the radiator cap, after the engine has completely cooled,
and check to see that coolant reaches the supply port.
1
Radiator pressure cap
2.
If the radiator is provided with a recovery tank, check the coolant
level of the recovery tank. When it is between the "FULL" and
"LOW" marks, the coolant will last for one day's work.
1
Recovery tank
A
Full
B
Low
Содержание HT21RT O
Страница 86: ...86 4000511390 E03 16 USA GB General data Breaking test procedure MS0004 Notes...
Страница 94: ...94 4000511390 E03 16 USA GB Chassis and turntable Tires Tyres and pressures Wheel replacement MS0006 Notes...
Страница 106: ...106 4000511390 E03 16 USA GB Chassis and turntable Gearbox inspection Oil replacement MS0011 Notes...
Страница 132: ...132 4000511390 E03 16 USA GB Chassis and turntable KUBOTA diesel engine MS0029 Notes...
Страница 142: ...142 4000511390 E03 16 USA GB Chassis and turntable Overload system MS0017 Notes...
Страница 160: ...160 4000511390 E03 16 USA GB Chassis and turntable Dismantling Reassembling wheels reducer MS0026 Notes...
Страница 184: ...184 4000511390 E03 16 USA GB Upper boom Procedure of dismantling reassembling telescope cylinder MS0014 Notes...
Страница 188: ...188 4000511390 E03 16 USA GB Upper boom Boom adjustment procedure MS0015 Notes...
Страница 192: ...192 4000511390 E03 16 USA GB Upper boom Boom angle sensor adjustment MS0018 Notes...
Страница 222: ...222 4000511390 E03 16 USA GB Hydraulics Hydraulic oil Level Replacement MS0019 Notes...
Страница 231: ...231 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 233: ...233 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 235: ...235 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 237: ...237 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 239: ...239 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Страница 240: ...240 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Страница 242: ...242 4000511390 E03 16 USA GB Electric Electrical wiring MS0025 Notes...