76
4000511390
E03.16 USA
/
GB
General data
Structural part inspection
MS0001
3.3 - FUNCTIONAL TESTS
The following tests must be carried out each 250 h or 6 months or afterwards :
• An important technical intervention.
• An accident resulting from a failure of a major component.
The following tests must be realized by a qualified staff under secure conditions.
The results of the tests must be entirely documented.
To avoid the swing of the machine during the test, it is imperative that a device of reserve (chain, not of anchoring) is
used during the test.
3.4 - DYNAMIC TESTS
The machine must be place on level and firm ground.
With 100% of the maximum allowed load, operate from ground control box (or emergency control box) all the
movements ; the platform floor must reach a height of about 1 above the ground.
The functional tests must show the following facts :
• The machine carried out all the movements without jolts while supporting the load.
• All the security device function correctly.
• Authorized maximum speeds of operation are not exceeded.
Refer to the user manual for the description of the safety device and technical characteristics to be reached.
3.5 - STRUCTURAL TEST (OVERLOAD)
The following test shows that the structure of the machine is in conformity with the safety requirements.
The machine must be place on level and firm ground.
With 100% of the maximum allowed load, operate from ground control box (or emergency control box) all the
movements ; the platform floor must reach a height of about 1 above the ground :
• Measure the distance between the ground and the basket (or of the platform).
• Leave the machine in static during 15 mnn.
• Measure the distance between the ground and the basket (or of the platform).
If the difference between two measurements does not exceed 4 cm (1.575 in) : the test is validated.
If the difference between two measurements exceeds 4 cm (1.575 in), to contact HAULOTTE Services® or to carry
out the additional tests described below.
MS0003 - § 3.2 Cylinder inspection.
Содержание HT21RT O
Страница 86: ...86 4000511390 E03 16 USA GB General data Breaking test procedure MS0004 Notes...
Страница 94: ...94 4000511390 E03 16 USA GB Chassis and turntable Tires Tyres and pressures Wheel replacement MS0006 Notes...
Страница 106: ...106 4000511390 E03 16 USA GB Chassis and turntable Gearbox inspection Oil replacement MS0011 Notes...
Страница 132: ...132 4000511390 E03 16 USA GB Chassis and turntable KUBOTA diesel engine MS0029 Notes...
Страница 142: ...142 4000511390 E03 16 USA GB Chassis and turntable Overload system MS0017 Notes...
Страница 160: ...160 4000511390 E03 16 USA GB Chassis and turntable Dismantling Reassembling wheels reducer MS0026 Notes...
Страница 184: ...184 4000511390 E03 16 USA GB Upper boom Procedure of dismantling reassembling telescope cylinder MS0014 Notes...
Страница 188: ...188 4000511390 E03 16 USA GB Upper boom Boom adjustment procedure MS0015 Notes...
Страница 192: ...192 4000511390 E03 16 USA GB Upper boom Boom angle sensor adjustment MS0018 Notes...
Страница 222: ...222 4000511390 E03 16 USA GB Hydraulics Hydraulic oil Level Replacement MS0019 Notes...
Страница 231: ...231 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 233: ...233 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 235: ...235 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 237: ...237 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 239: ...239 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Страница 240: ...240 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Страница 242: ...242 4000511390 E03 16 USA GB Electric Electrical wiring MS0025 Notes...