104
4000511390
E03.16 USA
/
GB
Chassis and turntable
Slew ring inspection
MS0010
5.2 - MEASUREMENT OF THE CLEARANCE
Place the machine in the following conditions :
• On flat ground, Set up barriers to define the test area.
• No load in the platform.
• From the ground control box, align the turret at 90 ° to the chassis.
• Lift the boom approximatively 30 ° from the ground.
• Completely retract the boom telescope.
• Jib in horizontal position (if fitted).
From the magnetic comparator, note the clearance ( J1) between chassis (or turret) and the slew ring.
C l e a r a n c e b e t w e e n c h a s s i s ( o r t u r r e t ) a n d s l e w r i n g
After having carried out the measurement :
• Lower the boom at horizontal position.
• Lift the arm (if exists) as its maximum position. Don’t extend the telescopic boom.
• Telescope the boom to its maximum angle (completely extend the telescope).
• Jib in horizontal position(if fitted).
In its new configuration, note the clearance ( J1) between chassis (or turret) and the slew ring as previously.
• If the difference between two measurements does not exceed 2 mm (0.08 in) : the test validates correct
operation.
• Otherwise, contact HAULOTTE Services® to repair the system.
J1
Содержание HT21RT O
Страница 86: ...86 4000511390 E03 16 USA GB General data Breaking test procedure MS0004 Notes...
Страница 94: ...94 4000511390 E03 16 USA GB Chassis and turntable Tires Tyres and pressures Wheel replacement MS0006 Notes...
Страница 106: ...106 4000511390 E03 16 USA GB Chassis and turntable Gearbox inspection Oil replacement MS0011 Notes...
Страница 132: ...132 4000511390 E03 16 USA GB Chassis and turntable KUBOTA diesel engine MS0029 Notes...
Страница 142: ...142 4000511390 E03 16 USA GB Chassis and turntable Overload system MS0017 Notes...
Страница 160: ...160 4000511390 E03 16 USA GB Chassis and turntable Dismantling Reassembling wheels reducer MS0026 Notes...
Страница 184: ...184 4000511390 E03 16 USA GB Upper boom Procedure of dismantling reassembling telescope cylinder MS0014 Notes...
Страница 188: ...188 4000511390 E03 16 USA GB Upper boom Boom adjustment procedure MS0015 Notes...
Страница 192: ...192 4000511390 E03 16 USA GB Upper boom Boom angle sensor adjustment MS0018 Notes...
Страница 222: ...222 4000511390 E03 16 USA GB Hydraulics Hydraulic oil Level Replacement MS0019 Notes...
Страница 231: ...231 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 233: ...233 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 235: ...235 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 237: ...237 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 239: ...239 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Страница 240: ...240 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Страница 242: ...242 4000511390 E03 16 USA GB Electric Electrical wiring MS0025 Notes...