193
4000511390
E03.16 USA
/
GB
Upper boom
Procedure of dismantling / reassembling cage
MS0027
Upper boom
Procedure of dismantling / reassembling cage
1 - You will need
• PPE (Personal Protective Equipment: glove, safety shoe,
glasses, etc…)
• Standard tool kit
• Overhead crane or equivalent, for removal/replacement
of cage (Min 500 kg capacity)
• Suitable slings and lifting equipment for removing the
cage (Min 500 kg)
• Torque wrench suitable : 47 Nm
• Torque wrench suitable : 370 Nm
• Torque wrench suitable : 485 Nm
• Place barriers around the perimeter of the work area
• The technician should take all steps to protect themselves or others against all risks of injury related to this intervention.
• The technician should ensure they have the PPE (personal protective equipment) suitable for the job and the particular conditions of
environment in witch the material can be found (see safety information specific to the operation site).
• Position the machine on a flat ground, stabilized and in a released environment.
• Cut the contact, to remove the key, to open cut it battery.
• Place a "DO NOT USE" decal near the start/stop contactor (key switch) to inform the personnel that interventions are being carried out
on the equipment.
• The pressure in the hydraulic system is very important. It can cause accidents. Relieve the pressure before any intervention and never
search for oil leaks by hand.
• Attention to the risks of burns, the hydraulic system works at high temperatures.
• The exhaust fumes of the engines contain harmful products of combustion. Only start and run the engine in a well ventilated Area. In a
closed room, you must use a suitable system to evacuate the exhaust to the outside.
Содержание HT21RT O
Страница 86: ...86 4000511390 E03 16 USA GB General data Breaking test procedure MS0004 Notes...
Страница 94: ...94 4000511390 E03 16 USA GB Chassis and turntable Tires Tyres and pressures Wheel replacement MS0006 Notes...
Страница 106: ...106 4000511390 E03 16 USA GB Chassis and turntable Gearbox inspection Oil replacement MS0011 Notes...
Страница 132: ...132 4000511390 E03 16 USA GB Chassis and turntable KUBOTA diesel engine MS0029 Notes...
Страница 142: ...142 4000511390 E03 16 USA GB Chassis and turntable Overload system MS0017 Notes...
Страница 160: ...160 4000511390 E03 16 USA GB Chassis and turntable Dismantling Reassembling wheels reducer MS0026 Notes...
Страница 184: ...184 4000511390 E03 16 USA GB Upper boom Procedure of dismantling reassembling telescope cylinder MS0014 Notes...
Страница 188: ...188 4000511390 E03 16 USA GB Upper boom Boom adjustment procedure MS0015 Notes...
Страница 192: ...192 4000511390 E03 16 USA GB Upper boom Boom angle sensor adjustment MS0018 Notes...
Страница 222: ...222 4000511390 E03 16 USA GB Hydraulics Hydraulic oil Level Replacement MS0019 Notes...
Страница 231: ...231 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 233: ...233 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 235: ...235 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 237: ...237 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 F o l i o 2 2...
Страница 239: ...239 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Страница 240: ...240 4000511390 E03 16 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Страница 242: ...242 4000511390 E03 16 USA GB Electric Electrical wiring MS0025 Notes...