3.2 C

oMplIanCe

 

WITh

 C

odes

The boiler with standard components and with many options complies 

with American National Standard/

CSA

 Standard 

ANSI Z21.13/CSA 4.9

latest edition, Gas-Fired Low Pressure Steam and Hot Water Boilers.
The heat exchanger is constructed and stamped in accordance with 

ASME

 Boiler and Pressure Vessel Code, Section IV (160 psig maximum 

operating pressure) and Section VIII.
Installation of the boiler must conform to all the requirements of all 

national, state and local codes established by the authorities having 

jurisdiction or, in the absence of such requirements, to the National Fuel 

Gas Code, 

ANSI Z223.1/NFPA 54

 latest edition in the U.S. In Canada, the 

equipment shall be installed in accordance with the current Installation 

Code for Gas Burning Appliances and Equipment, 

CAN/CSA-B.149

, latest 

edition, and applicable Provincial Regulations for the class, which should 

be carefully followed in all cases. Authorities having jurisdiction should be 

consulted before installations are made.
Where required by local codes, the installation must conform to American 

Society of Mechanical Engineers Safety Code for Controls and Safety 

Devices for Automatically Fired Boilers (

ASME CSD-1

).

In the Commonwealth of Massachusetts (a) this unit must be installed by 

a licensed pipe fitter/plumber, (b) field installed gas cocks must be “T” handle type, (c) piping of condensate shall 

conform to the State Plumbing Code, and (d) refer to the Massachusetts Supplement for further details.

3.3.1 Foundation

Provide a firm, level foundation, preferably of concrete. Lifting the front of the boiler slightly will allow the boiler 

to be rolled off the shipping skid onto the concrete foundation. Once in position, the wheel bolts may be removed 

allowing the wheels to recess up into the boiler. The base will sit flat on the provided foundation. If the boiler is to 

be pulled out for maintenance, the wheels may be left attached.

3.3 s

eTup

The boiler must be level to function properly. Six 9/16” holes in the base may be used for 3/8” seismic anchors.

3.3.2 Placement

Bumping hazard from overhead 

ducts! Install all components with 

adequate vertical clearances. 

The wheels provided with this 

boiler are for positioning purposes 

only. When positioning this boiler, 

maintain positive control of it at 

all times. Do not attempt to move 

the boiler on surfaces that are not 

level. Failure to heed this warning 

could result in personal injury or 

death.

Installation and service must be 

performed by a qualified installer, 

service agency, or gas supplier.

!

WARNING

!

WARNING

!

WARNING

Controls and other equipment 

that are damaged or fail due to 

weather exposure are not covered 

by warranty.

The boiler may be installed on a 

combustible floor; however, the 

boiler must never be installed on 

carpeting.

n

oTICe

!

n

oTICe

!

3 I

nsTallaTIon

3.1.2 storage Prior to Installation

If the boiler is not installed immediately, it must be stored in a location 

adequately protected from the weather, preferably indoors. If this is not 

possible, then it should remain in the shipping container and be covered 

by a tarpaulin or other waterproof covering.

3.1.1 Initial Inspection

Upon receiving the boiler, inspect it for signs of shipping damage. Some 

damage may be hidden. Unpack the boiler, open the front and side doors 

and inspect the boiler. Verify that the total number of pieces shown on the 

packing slip agrees with those actually received.

3.1 r

eCeIvIng

 

and

 s

Torage

3.4 e

leCTrICal

 C

onneCTIons

The 

SC-3000

 and 

SC-4000

 boilers are available as either 

208-240 VAC

, three phase, 60 hertz or 

440-480VAC

, three 

phase, 60 hertz electrical service. 

Refer to sections 6.1.4, 6.1.5 and 6.2.2

 for proper wiring and configuration of 

the electrical connections. The total operating amperage is indicated on the rating nameplate. Each 

SC-3000

 or 

SC-4000

 boiler requires less than 20 Amps. Before starting the boiler, check to ensure that the proper electrical 

service is connected to the boiler.
An external electrical disconnect (not supplied with the boiler) is required. The boiler electrical service must be 

installed and grounded in accordance with local codes or in the absence of such requirements, in the U.S. with 

National Electrical Codes, 

ANSI/NFPA

 No. 70 latest edition or, in Canada, to the Canadian Electrical Code, Part I, 

CSA C22.1

, latest edition. Installed conduit must not block openings and must allow the side doors to be opened.

3.3.3 Clearances

If the boiler is to be installed near combustible surfaces, the minimum clearances shown in the pictures and 

table below must be maintained. Failure to provide for the service access clearances, even with non-combustible 

surfaces, may cause future problems servicing the boiler. Maintain a clearance from the vent to combustible 

† “C” Space required for pipes, ducts, etc. in this area 

above the boiler. 
* “B” Clearance depends upon exhaust vent configuration.
** Do not put pipes, ducts, vents, etc in this space. 

Electrical conduit must be installed vertically so that the 

side doors can be opened.  NOTE - Annual maintenance 

items can be accessed from the front of the boiler.

Type of Surface

Dimensions (inches)

A

B

C†

D

Combustible Surfaces 

Minimum Clearances

30

12*

24

12

Recommended Clearances 

for Service Access

30

12*

24

12**

surfaces of 24” or as specified in the vent manufacturer’s listed installation instructions. The boiler must be installed 

in a space large in comparison to the boiler as described in the National Fuel Gas Code,

 ANSI Z223.1

, latest edition.

The main power connections are connected to the over current safety device rated for a 20 Amp 3 phase circuit 

(for either 

208-240

 or 

480 VAC

) and ground terminal located in the main power connection box. This box is located 

at the lower front left side of the boiler. The power connection has four points of contact: Terminals 1, 3, 5 and G. 

Connect the three wires supplying the three phase power to terminals 1, 3 and 5. Connect the main boiler ground 

wire to G.

The internal control transformer may be pre-wired from the factory for operation with 

240 VAC

. If 

208 VAC

 three 

phase power is used, the internal control transformer must be wired for operation at this lower voltage. The wire 

in terminal 

X3

 on the load side of the internal control transformer must be moved to terminal 

X4

. This supplies the 

120 VAC

 power to the controls from the

 208 VAC

 main voltage. Refer to Sections 

6.1.4

 and 

6.1.5

 for proper wiring 

and configuration of the internal control transformer.

3.4.1 the Power Input Junction Box

Figure 3.3.3

Table 3.3.3

A

C

B

D

D

D

Содержание P-K SONIC SC-3000

Страница 1: ...ee 877 728 5351 Fax 570 476 7247 www harscopk com 2013 Harsco Industrial Patterson Kelley SONIC201 Revised June 12 2014 C S A Design Certified Complies with ANSI Z21 13 CSA 4 9 Gas Fired Low Pressure...

Страница 2: ...al connections for tightness as connections may come lose during shipping Venting Maintain exhaust pressure from 04 wc to 22 wc Hydronics Maximum Flow SC 4000 384 gpm SC 3000 285 gpm Minimum Flow Igni...

Страница 3: ...itches 23 3 10 Initial Adjustments 23 3 10 1 Operating Temperature Controller 23 3 10 2 Boiler Set Point 24 3 10 3 Other CH Parameters 24 3 10 4 Other Parameters 24 3 10 5 Additional Menu Items 24 3 1...

Страница 4: ...s fired boilers are fully modulating using variable speed combustion blowers sophisticated microprocessor controls modulating gas safety shut off control valves and a unique stainless steel heat excha...

Страница 5: ...res de verrouillage signalisation lors de l entretien WARNING Improper use may result in fire or injury Read instructions safety manual before installing operating or servicing boiler The safety label...

Страница 6: ...ainer and be covered by a tarpaulin or other waterproof covering 3 1 1 Initial Inspection Upon receiving the boiler inspect it for signs of shipping damage Some damage may be hidden Unpack the boiler...

Страница 7: ...connected to the DHW temperature sensor or thermostat This circuit is energized by the boiler with a 5V potential The temperature sensor must be a NTC having 12k 77 F Header Temp Sensor TB1 9 and TB1...

Страница 8: ...re that may cause excessive condensate production in the vent Direct Vent An appliance that is constructed and installed so that all air for combustion is derived directly from outdoors and all flue g...

Страница 9: ...d by deducting the blockage area of any fixed louvers grilles or screens from the total area of the opening 2 Screens shall be not smaller than 3 Motorized louvers shall be interlocked with the applia...

Страница 10: ...echnical Service 1 877 728 5351 INSTALLATION Gas Fired Boiler The boiler vent should not be connected into any portion of another mechanical draft system without consulting the vent manufacturer The b...

Страница 11: ...ll operate at maximum speed Do not operate a summer exhaust fan Close fireplace dampers 4 Place the appliance being inspected in operation Follow the lighting instructions Adjust the thermostat so tha...

Страница 12: ...tted to the boiler The boiler shall not be used as a pipe anchor When installed in a two pipe system that provides both chilled and hot water the control system should be configured so as to limit the...

Страница 13: ...guration 2 Place the boiler in operation at the high fire setting BNR TEST MODE HI 3 Smoothly close the downstream manual isolation valve to reduce the gas flow and cause flame failure 4 The display w...

Страница 14: ...hnician to hold the boiler in high or low fire during firing operation so that the combustion adjustment can be performed as indicated below The second test mode checks the fan rate with the burner of...

Страница 15: ...ssary 3 11 3 Checking Flame Signal Using the control panel enter the information mode and scroll down view the flame signal This shows A when the boiler is firing and shows 0 A when the boiler is not...

Страница 16: ...orrective action or repair 5 1 2 Weekly Observe the conditions of the main flame A normal high fire flame is mostly orange with a blue halo while at low fire the burner will glow yellowish orange Corr...

Страница 17: ...temperature low water level WARNING 5 6 Troubleshooting 5 6 3 Low Gas Pressure The low gas pressure switch opens when there is or has been insufficient gas pressure available for proper operation of...

Страница 18: ...INTERNAL ERROR 31 Internal Error 31 Call for service Code ENVI Display Lockout Description E01 OUT TEMP SENS OPEN Outlet Temperature Sensor Open Boiler outlet water temperature sensor open circuit E02...

Страница 19: ...o not ground through the conduit Terminal Number Label Description 3 120V AC Neutral Neutral for use with TB2 10 Switched Output 4 120V AC Neutral Neutral for use with TB2 11 3 Way Valve 5 120V AC Neu...

Страница 20: ...ly configured for either 208V 220 240V or 440 480V three phase 60 hertz service Improper configuration of the transformer could result in serious injury or death The high voltage TB2 terminal block is...

Страница 21: ...77 728 5351 Gas Fired Boiler 38 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 Gas Fired Boiler PARTS TECHNICAL SUPPORT PARTS TECHNICAL SUPPORT SC 3000 SC 4000 220 240 VAC three p...

Страница 22: ...1 877 728 5351 Gas Fired Boiler 40 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 Gas Fired Boiler PARTS TECHNICAL SUPPORT PARTS TECHNICAL SUPPORT 6 1 5 SC 3000 SC 4000 Boiler Wir...

Страница 23: ...lley Technical Service 1 877 728 5351 Gas Fired Boiler 42 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 Gas Fired Boiler PARTS TECHNICAL SUPPORT PARTS TECHNICAL SUPPORT 6 1 5 2 S...

Страница 24: ...on Kelley Technical Service 1 877 728 5351 Gas Fired Boiler 44 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 Gas Fired Boiler PARTS TECHNICAL SUPPORT PARTS TECHNICAL SUPPORT 6 1...

Страница 25: ...on Kelley Technical Service 1 877 728 5351 Gas Fired Boiler 46 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 Gas Fired Boiler PARTS TECHNICAL SUPPORT PARTS TECHNICAL SUPPORT 6 1...

Страница 26: ...5 7 6 4 B 2 4 A Mark Description 1 Heat Exchanger 2 Blower Burner Assembly 3 Base 4 A Gas train LP 4 B Gas Train Natural Gas 5 Controller 6 Electrical Box 7 Front Door Control Panel 8 Cabinet 6 2 1 Ma...

Страница 27: ...Water Connection 5 Condensate Collector 6 Igniter 7 Burner 8 Burner Gasket 9 Burner Hood 6 2 3 SC 3000 SC 4000 Heat Engine Mark Description 1 Burner 2 Burner Transition Piece 3 Blower 4 Venturi 5 Manu...

Страница 28: ...cial or consequential damages such as loss of the use of products facilities or production inconvenience loss of time or labor expense involved in repairing or replacing the alleged defective Product...

Страница 29: ...Date Hi Low Fire O2 CO CO2 Stack Temp pH Action By Appendix 1 Maintenance Log 54 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 APPENDIX 1 Gas Fired Boiler...

Страница 30: ...in section 3 10 4 to get 5 O2 in the flue gas If this cannot be achieved perform the following steps If the O2 is too high then the inlet gas pressure should be adjusted to the minimum pressure allow...

Страница 31: ...ntire hydronic system Samples of the system water with cleaner should be taken and analyzed to ensure proper cleaner strength Once cleaned the system should be flushed with fresh fill water until the...

Отзывы: