Harsco Industrial P-K SONIC SC-3000 Скачать руководство пользователя страница 12

20

Harsco Industrial, Patterson-Kelley Technical Service 1.877.728.5351

INST

alla

TION

Gas Fired Boiler

21

Harsco Industrial, Patterson-Kelley Technical Service 1.877.728.5351

INST

alla

TION

Gas Fired Boiler

Water Quality 

The boiler heat exchanger is made of stainless steel. The heat exchanger 

requires proper water conditions to remain efficient and function properly. 

For information, please refer to Hartsco Industrial Patterson Kelley Multi-

Metal Systems Water Quality Standards as it appears in Appendix 3 as 

this applies to the warranty of your heat exchanger.

strainer

To avoid possible contamination of the boiler with dirt, rust or sediment from 

the system, a strainer near the boiler inlet is strongly recommended.Even 

new systems may contain sufficient foreign material to eventually reduce 

the performance of the heat exchanger. Adequate circulation of good clean 

water is essential for maximum efficiency and long life of the boiler.

Relief Valve Piping

Each boiler is supplied with a pressure-relief valves sized in accordance 

with ASME requirements. The relief valves must be piped to an 

acceptable drain. Reducing couplings or other restrictions are not 

permitted in the discharge line. The Section IV valve must be installed 

as per Fig 3.7.2 and the Section VIII valve must be installed according to 

ASME/local codes. Both valves are provided with the boiler for convience.

low Water Cut-off

The boiler is furnished with a probe-type low water cut-off; no field piping 

is required. If the water level in the boiler drops below the probe, the 

boiler will shut down and 

LOCKOUT LOW WATER LEVEL

 will be displayed 

on the control panel. The low water cutoff circuit will automatically reset 

when the low water condition clears; however the boiler controls will retain 

the lockout condition until the reset button on the display is depressed. 

Installation of external limit controls may be required by certain codes or in 

certain installations. Review applicable local codes for details.

Drain Valve and Piping

A drain valve is factory installed in the boiler inlet (system return) piping.

Prior to draining the boiler, electrical power and gas supply must be turned 

off to the boiler, and the boiler must be isolated from the system at the 

supply and return connections.

Condensate Drain

The condensate is acidic (pH between 3.0 and 5.0) and may be corrosive 

to some building drain systems. A condensate neutralization system may 

be required and is available from Harsco Industrial, Patterson-Kelley. If 

the condensate drainage system is exposed to freezing temperatures, it 

must be field heat traced. The boiler could generate up to one gallon of 

condensate per 100,000 BTU input. As an example, a 

SC-3000

 boiler at full 

fire could produce 30 gallons per hour of condensate.

All water connections should be in compliance with national, state and local code requirements. Adapters from 

Victaulic to NPT are available from Harsco Industrial, Patterson-Kelley. 
The bottom rear connection to the boiler is the INLET and must be used for the return from the system.
The top rear connection to the boiler is the OUTLET and must be connected as the supply to the system.
Piping must be installed such that no piping stresses are transmitted to the boiler. The boiler 

shall not

 be used as a 

pipe anchor.

When installed in a two-pipe system that provides both chilled and hot 

water, the control system should be configured so as to limit the time rate of change of temperature at the boiler. 

Consult your authorized Harsco Industrial, Patterson-Kelley boiler representative for application guidance.

The boiler and all gas piping connections should be pressure-tested and 

must be checked for leaks before being placed into service. Test with 

compressed air or inert gas if possible.
The boiler must be 

disconnected

 at the boiler manual shut-off valve 

(located at the end of the supplied gas train) from the gas supply piping 

system during any pressure testing of the system at pressures in excess 

of 1/2 psig (14" wc).
During any pressure testing of the gas supply piping system at pressures 

equal to or less than 1/2 psig (14" wc), the boiler must be isolated from 

the gas supply piping system by closing the manual shut-off.
Some leak test solutions, including soap and water, may cause corrosion.

These solutions should be rinsed-off with water after testing.

3.6.1 Gas supply Piping by Installer

3.7 b

oIler

 W

aTer

 p

IpIng

3.7.1.1 Piping with Refrigeration lines

The boiler piping system of a hot water heating boiler connected to heating coils located in air handling units, 

where they may be exposed to refrigerated air circulation, must be equipped with flow control valves or other 

automatic means to prevent gravity circulation of the boiler water during the cooling cycle.

3.7.1.2 Piping with Air handling units

3.7.2 Boiler Inlet and Outlet Connections

The 

SC-3000 -

 

SC-4000 

boiler 

is furnished with 4” grooved 

connections and Victaulic Style 

75 Couplings. These couplings 

must be used with the EPDM 

Victaulic seals. Isolating valves 

must be installed in both water 

connections.

Condensate Trap must be piped 

to drain in accordance with all 

national, state and local codes. If 

installed outdoors and the local 

climate requires freeze protection, 

it must be field heat traced. 

n

oTICe

!

n

oTICe

!

3.7.3 Boiler Water Piping by Installer

The low water cutoff probe only 

prevents boiler operation when 

the water level in the boiler is 

insufficient. It does not detect low

 

water conditions in other parts of

 

the system. Installation of 

additional low water safety 

devices to protect the system 

should be considered.

n

oTICe

!

This drain valve is factory installed 

for draining of the boiler water 

only, not the entire system. 

Draining of the system through 

the boiler will result in depositing 

sediment from the system in the 

boiler which will result in poor 

heat transfer characteristics of the 

boiler and early boiler failure.

n

oTICe

!

Condensate Trap must be piped 

to drain in accordance with all 

national, state and local codes.

n

oTICe

!

Glycol or other treatment 

chemicals added to the system 

must be certified by the chemical 

manufacturer for use in multi-

metal systems that include 

stainless steel boilers.

n

oTICe

!

Under no circumstances should 

petroleum based cleaning or 

sealing compounds be used in the 

boiler system.

n

oTICe

!

Under no circumstances should 

the hydronic system be flushed 

while the boiler is attached to 

the system since the debris 

or corrosion products could 

accumulate in the boiler and plug 

the boiler heat exchanger.

n

oTICe

!

3.7.4 Flushing and Filling

Figure 3.7.2

Install Section IV Relief 

Valve here

Possible installation loca

-

tion of Section VIII Relief 

Valve

Содержание P-K SONIC SC-3000

Страница 1: ...ee 877 728 5351 Fax 570 476 7247 www harscopk com 2013 Harsco Industrial Patterson Kelley SONIC201 Revised June 12 2014 C S A Design Certified Complies with ANSI Z21 13 CSA 4 9 Gas Fired Low Pressure...

Страница 2: ...al connections for tightness as connections may come lose during shipping Venting Maintain exhaust pressure from 04 wc to 22 wc Hydronics Maximum Flow SC 4000 384 gpm SC 3000 285 gpm Minimum Flow Igni...

Страница 3: ...itches 23 3 10 Initial Adjustments 23 3 10 1 Operating Temperature Controller 23 3 10 2 Boiler Set Point 24 3 10 3 Other CH Parameters 24 3 10 4 Other Parameters 24 3 10 5 Additional Menu Items 24 3 1...

Страница 4: ...s fired boilers are fully modulating using variable speed combustion blowers sophisticated microprocessor controls modulating gas safety shut off control valves and a unique stainless steel heat excha...

Страница 5: ...res de verrouillage signalisation lors de l entretien WARNING Improper use may result in fire or injury Read instructions safety manual before installing operating or servicing boiler The safety label...

Страница 6: ...ainer and be covered by a tarpaulin or other waterproof covering 3 1 1 Initial Inspection Upon receiving the boiler inspect it for signs of shipping damage Some damage may be hidden Unpack the boiler...

Страница 7: ...connected to the DHW temperature sensor or thermostat This circuit is energized by the boiler with a 5V potential The temperature sensor must be a NTC having 12k 77 F Header Temp Sensor TB1 9 and TB1...

Страница 8: ...re that may cause excessive condensate production in the vent Direct Vent An appliance that is constructed and installed so that all air for combustion is derived directly from outdoors and all flue g...

Страница 9: ...d by deducting the blockage area of any fixed louvers grilles or screens from the total area of the opening 2 Screens shall be not smaller than 3 Motorized louvers shall be interlocked with the applia...

Страница 10: ...echnical Service 1 877 728 5351 INSTALLATION Gas Fired Boiler The boiler vent should not be connected into any portion of another mechanical draft system without consulting the vent manufacturer The b...

Страница 11: ...ll operate at maximum speed Do not operate a summer exhaust fan Close fireplace dampers 4 Place the appliance being inspected in operation Follow the lighting instructions Adjust the thermostat so tha...

Страница 12: ...tted to the boiler The boiler shall not be used as a pipe anchor When installed in a two pipe system that provides both chilled and hot water the control system should be configured so as to limit the...

Страница 13: ...guration 2 Place the boiler in operation at the high fire setting BNR TEST MODE HI 3 Smoothly close the downstream manual isolation valve to reduce the gas flow and cause flame failure 4 The display w...

Страница 14: ...hnician to hold the boiler in high or low fire during firing operation so that the combustion adjustment can be performed as indicated below The second test mode checks the fan rate with the burner of...

Страница 15: ...ssary 3 11 3 Checking Flame Signal Using the control panel enter the information mode and scroll down view the flame signal This shows A when the boiler is firing and shows 0 A when the boiler is not...

Страница 16: ...orrective action or repair 5 1 2 Weekly Observe the conditions of the main flame A normal high fire flame is mostly orange with a blue halo while at low fire the burner will glow yellowish orange Corr...

Страница 17: ...temperature low water level WARNING 5 6 Troubleshooting 5 6 3 Low Gas Pressure The low gas pressure switch opens when there is or has been insufficient gas pressure available for proper operation of...

Страница 18: ...INTERNAL ERROR 31 Internal Error 31 Call for service Code ENVI Display Lockout Description E01 OUT TEMP SENS OPEN Outlet Temperature Sensor Open Boiler outlet water temperature sensor open circuit E02...

Страница 19: ...o not ground through the conduit Terminal Number Label Description 3 120V AC Neutral Neutral for use with TB2 10 Switched Output 4 120V AC Neutral Neutral for use with TB2 11 3 Way Valve 5 120V AC Neu...

Страница 20: ...ly configured for either 208V 220 240V or 440 480V three phase 60 hertz service Improper configuration of the transformer could result in serious injury or death The high voltage TB2 terminal block is...

Страница 21: ...77 728 5351 Gas Fired Boiler 38 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 Gas Fired Boiler PARTS TECHNICAL SUPPORT PARTS TECHNICAL SUPPORT SC 3000 SC 4000 220 240 VAC three p...

Страница 22: ...1 877 728 5351 Gas Fired Boiler 40 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 Gas Fired Boiler PARTS TECHNICAL SUPPORT PARTS TECHNICAL SUPPORT 6 1 5 SC 3000 SC 4000 Boiler Wir...

Страница 23: ...lley Technical Service 1 877 728 5351 Gas Fired Boiler 42 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 Gas Fired Boiler PARTS TECHNICAL SUPPORT PARTS TECHNICAL SUPPORT 6 1 5 2 S...

Страница 24: ...on Kelley Technical Service 1 877 728 5351 Gas Fired Boiler 44 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 Gas Fired Boiler PARTS TECHNICAL SUPPORT PARTS TECHNICAL SUPPORT 6 1...

Страница 25: ...on Kelley Technical Service 1 877 728 5351 Gas Fired Boiler 46 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 Gas Fired Boiler PARTS TECHNICAL SUPPORT PARTS TECHNICAL SUPPORT 6 1...

Страница 26: ...5 7 6 4 B 2 4 A Mark Description 1 Heat Exchanger 2 Blower Burner Assembly 3 Base 4 A Gas train LP 4 B Gas Train Natural Gas 5 Controller 6 Electrical Box 7 Front Door Control Panel 8 Cabinet 6 2 1 Ma...

Страница 27: ...Water Connection 5 Condensate Collector 6 Igniter 7 Burner 8 Burner Gasket 9 Burner Hood 6 2 3 SC 3000 SC 4000 Heat Engine Mark Description 1 Burner 2 Burner Transition Piece 3 Blower 4 Venturi 5 Manu...

Страница 28: ...cial or consequential damages such as loss of the use of products facilities or production inconvenience loss of time or labor expense involved in repairing or replacing the alleged defective Product...

Страница 29: ...Date Hi Low Fire O2 CO CO2 Stack Temp pH Action By Appendix 1 Maintenance Log 54 Harsco Industrial Patterson Kelley Technical Service 1 877 728 5351 APPENDIX 1 Gas Fired Boiler...

Страница 30: ...in section 3 10 4 to get 5 O2 in the flue gas If this cannot be achieved perform the following steps If the O2 is too high then the inlet gas pressure should be adjusted to the minimum pressure allow...

Страница 31: ...ntire hydronic system Samples of the system water with cleaner should be taken and analyzed to ensure proper cleaner strength Once cleaned the system should be flushed with fresh fill water until the...