37
Harsco Industrial, Patterson-Kelley Technical Service 1.877.728.5351
Gas Fired Boiler
36
Harsco Industrial, Patterson-Kelley Technical Service 1.877.728.5351
Gas Fired Boiler
PAR
TS/TECHNICAL SUPPOR
T
PAR
TS/TECHNICAL SUPPOR
T
!
WARNING
Before making any electrical
connections to the boiler, verify
that the transformer is properly
configured for either 2
08V, 220-
240V
, or
440-480V
, three phase,
60 hertz service. Improper
configuration of the transformer
could result in serious injury or
death.
The high voltage (
TB2
) terminal
block is for
120 VAC
output loads
only. Do not connect any
120 VAC
supply voltage to the high voltage
(
TB2
) terminal block. Connecting
a 120 VAC supply voltage to
TB2
can result in serious injury or
death.
!
WARNING
6.1.4 sC-3000 & sC-4000 transformer Diagrams
sC-3000/sC-4000: 208 VAC, three phase, 60 hertz:
Page left blank intentionally
NOTES: