
26
4.4 MACHINE BREAK-IN
Although there are no operational restrictions on the
Clod Hopper when used for the first time, it is rec-
ommended that the following mechanical items be
checked:
A. Read Clod Hopper and auxiliary equipment man-
uals before starting.
B.
After operating for 1/2 hour:
1. Re-torque all other fasteners and hardware.
2. Check that all electrical connections are
tight and cords are routed out of the way or
protected.
3. Check for hydraulic leaks. Tighten any leaking
fittings.
4. Check the tension and alignment of all drive
belts and chains. Align or tighten as required.
5. Check the alignment and tension of all con-
veying belts. Realign or tighten as required.
6. Check oil level in each speed reduction gear
box for each drive. Top up as required.
7. Lubricate all grease fittings.
C.
After 2, 5 and 10 hours of operation:
1. Re-torque all fasteners and hardware.
2. Check that all electrical connections are
tight and cords are routed out of the way or
protected.
3. Check for hydraulic leaks. Tighten any leaking
fittings.
4. Check the alignment and tension of all con-
veying belts. Realign or tighten as required.
5. Check oil level in each speed reduction gear
box for each drive. Check the level daily
or more often if any are leaking. Top off as
required.
6. Then go to the regular servicing and mainte-
nance schedule as defined in the Maintenance
Section.
4.5 PRE-OPERATION CHECKLIST
Safe and efficient operation of your new Clod Hop-
per requires that each operator reads and follows all
safety precautions and operating procedures con-
tained in this section. Performing the following pre-
operation checklist is important for personal safety
as well as for continued mechanical soundness and
longevity of your new Harriston Clod Hopper. The
checklist should be performed before operating the
machine and prior to each operation thereafter.
1. Lubricate the machine according to the schedule
prescribed in the "Maintenance Section".
2. Insure that proper protective gear is in good repair
and available for use by each operator. Make cer-
tain that each operator uses the protective gear.
Protective gear includes but, is not limited to:
- Leather gloves
- Safety glasses
or face shield
- Full length pro-
tective clothing
- Steel toed boots
with slip resist-
ant soles.
3. Insure that all safety guards and shields are in
good repair and securely in place.
4. Check that all conveying belts are properly ten-
sioned and aligned. Adjust if required.
5. Check the tension and alignment of all drive belts
and chains. Tension or align as required.
6. Check for hydraulic leaks. Tighten any leaking
fittings.
7. Check oil level in each speed reduction gear box
for each drive. Check the level daily or more often
if any are leaking. Top off as required.
8. Check for and remove all entangled material.
9. Make sure that all electrical switches are in the
OFF position before supplying power.
10. Check that all electrical connections are tight and
cords are routed out of the way or protected.
11. Be sure the working area is clean and dry to pre-
vent tripping or slipping.
Содержание 4240 CLOD HOPPER
Страница 1: ...HARRISTON INDUSTRIES 4240 CLOD HOPPER OPERATOR S MANUAL ...
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 10: ...2 ...
Страница 20: ...12 ...
Страница 31: ...23 H a M F G K L E X A N J W Q D S Q W N R Z T A P E B ...
Страница 32: ...24 Fig 1B MACHINE COMPONENTS V Y M O P N L a X U a F W R Q G H J a O R Y S T E ...
Страница 63: ...55 4 Clean machine with a power washer Fig 43 machine ...
Страница 76: ...68 ...
Страница 77: ...69 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE 7 SPECIFICATIONS 7 1 MECHANICAL ...
Страница 80: ...72 ...
Страница 82: ......
Страница 83: ......