STRATTON MK3 - Installation, Use and Maintenance
F. SPECIFIC START-UP PROCEDURE
"
Correctly install and connect the electrical connections.
"
Make the settings below in "specialist" mode
:
Line No. Value
• Time and date
menu
Set the time
Hour / minute (1)
HH.MM
Set the date
Day / month (2)
DD.MM
Set the year
Year (3)
YYYY
SIGNALS CONNECTION
Diagram: MK3-2
page 4 / 5
GND
IN
GND
IN
GND
IN
GND
IN
GND
PWM
GND
+10V
{
{
{
{
Secondary bottle
sensor (B10)
External sensor B9
DHW sensor B3
Boiler pump supply
OK
OK
Short press
Press for 3 seconds
End user
Start-up
Specialist
OEM
Содержание STRATTON MK3 Series
Страница 2: ......
Страница 13: ...06 02 2023 13 154 STRATTON MK3 Installation Use and Maintenance...
Страница 44: ...44 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C Figure 19 Wiring diagram...
Страница 45: ...06 02 2023 45 154 STRATTON MK3 Installation Use and Maintenance...
Страница 149: ...06 02 2023 149 154 STRATTON MK3 Installation Use and Maintenance...
Страница 150: ...150 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C...
Страница 151: ...06 02 2023 151 154 STRATTON MK3 Installation Use and Maintenance...
Страница 152: ...152 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C...
Страница 153: ...06 02 2023 153 154 STRATTON MK3 Installation Use and Maintenance...