22 / 154
STRATTON MK3 - Installation, Use and Maintenance
00U07428680-C
4. INSTALLATION
The boiler is delivered with:
- A plan for helping fix the boiler to the wall.
- Two mounting hooks.
- A 4 bar (models below 70 kW) or 6 bar (models above 80 kW) safety valve.
- A plastic funnel that is adapted to the safety valve.
- A siphon and a flexible hose for evacuating condensates.
- An information plate for the 40 to 120 kW models switching to propane gas.
- A gas adapter for the 70 to 120 kW models switching to propane gas.
4.1. Installing the boiler
IMPORTANT:
The boiler must not bear the weight of the accessories and connections
(hydraulics, gas, exhaust system, etc.).
WARNING :
The use of the fixing hooks supplied with the product or our supports
is mandatory.
Hooks (provided)
Figure 5 - Mounting with hooks (supplied)
Содержание STRATTON MK3 Series
Страница 2: ......
Страница 13: ...06 02 2023 13 154 STRATTON MK3 Installation Use and Maintenance...
Страница 44: ...44 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C Figure 19 Wiring diagram...
Страница 45: ...06 02 2023 45 154 STRATTON MK3 Installation Use and Maintenance...
Страница 149: ...06 02 2023 149 154 STRATTON MK3 Installation Use and Maintenance...
Страница 150: ...150 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C...
Страница 151: ...06 02 2023 151 154 STRATTON MK3 Installation Use and Maintenance...
Страница 152: ...152 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C...
Страница 153: ...06 02 2023 153 154 STRATTON MK3 Installation Use and Maintenance...