13
Position one each of
the magnetic mounts
(one straight slot and
one rotating slot) be-
side and approxi-
mately 3 in. (76.2 mm)
behind the other refer-
ence bore with the
slots facing toward the
end of the turbine
housing. Turn the han-
dle to lock the mag-
nets.
Place a length of 2 in.
x 2 in. (50.8 mm x 50.8mm angle iron into the slots and tighten the set screw against the angle iron in the
straight slot magnetic mount. Tighten the set screw in the rotating slot magnetic mount.
Using a measuring tape, position the A-502 onto the angle iron horizontally near the center of the bore.
Tighten the set screws against the angle iron.
Place the A-501 Sweep Unit in the
A-502 and adjust it to the desired set
points as defined previously. Place
the L-705 Laser in the A-502L so the
bubble level is level from side to side
and secure it with the thumb screw.
Plug the battery pack in and move
the switch on the L-705 to the
“Pulse” position.
Содержание L-705
Страница 1: ......
Страница 18: ...15 Half Bore Alignment Setup...
Страница 27: ...24 Appendix B Configuring the R 1307 2 4ZB Readout Model R 1307 Readouts Control Panel...