Supplied By www.heating spares.co Tel. 0161 620 6677
11
Refer to Fig 15
a)
Lift the boiler into position using the lifting points shown in
Fig 15. Position the top of the boiler approximately 10 mm
above the top of the wall mounting plate and use the side
wings on the plate to locate the boiler in a horizontal
direction. Then carefully lower the boiler, ensuring that the two
top locating tabs are securely engaged.
b)
Locate and tighten the water valves to the boiler
. (Seals are
prefitted) Using the fittings supplied in the hardware pack:
c)
Connect the central heating system to the boiler flow and
return isolating valves.
13
DETERMINING THE POSITION OF THE
AIR/FLUE DUCT HOLE
14
4.4
SERVICE CONNECTIONS
4.3
MOUNTING THE BOILER
•
•
•
•
•
225mm
225mm
95mm
13(b)
SIDE FLUE
95mm
•
•
•
•
13(a)
REAR FLUE
POSITION OF DUCT HOLE
CENTRAL
HEATING
RETURN
MAINS WATER IN
•
DOMESTIC
HOT WATER
OUT
•
DRAIN POINT
•
FILLING
LOOP
•
CENTRAL
HEATING
FLOW
•
•
•
•
•
GAS SUPPL
Y
PRESSURE
RELIEF
30mm
95mm
•
230mm
•
295mm
•
340mm
•
355mm
•
420mm
SER
VICE
CONNECTIONS
•
POSITION OF W
ALL
MOUNTING PLATE
•
•
•
SER
VICE
CONNECTION
PIPES NOT
SUPPLIED
200mm
•
•
•
•
•
•
•
•
Commission the central heating system as described in section 5.1
and then proceed to Section 4.5.
d)
Connect the mains water supply to the boiler DHW inlet
isolating valve.
e)
Connect the DHW supply pipe to the boiler DHW outlet
connection.