18 June 2016
X6-ElectroMod
A 160AH 1.5KW Electrical Power Generator for the BMW X6
pg. 25
Copyright © 2016, HallonPower. All content and images presented on this website are copyrighted © and all rights are reserved.
All manufacturer names, symbols, and descriptions, used in our images and text are used solely for identification purposes only. It is neither inferred nor
implied that any item sold here, is a product authorized by or in any way connected with any vehicle manufacturers displayed on this page. This document
may be modified at any time and without notice.
7.
Now take each of the 4 CBs and start attaching the cables to them, bolting them down.
WARNING: Do not overtighten!
2x 150A CBs go to the top-most slots (CB#4 & CB#5), 1x 50A to the bottom left slot (CB#6)
and 1x 200A to the bottom right slot (CB#7).
You will probably need to put some pressure on the CBs in order for them to sit down
properly, so please make sure that they are nearly flat on the panel before you start screwing
them down.
CAUTION: make sure you attach the right CB to the right slot. Failure to do so will result in
malfunction of the system or even damage.
H. The Batteries
1.
Make sure you have levelled the Service Battery Bank (SBB) area where the batteries will sit.
Please Note: A few strips of fitted carpeting should do it, in order to fill in the grooves on the
trunk compartment floor.
2.
Move all cables out of the way and lower the first battery. After the first battery sits flat,
push it all the way towards the PD Vertical Panel and make sure it lays flat against it without
any space between them.
Please Note: +ve poles should be facing away from you towards the SP.
-ve poles should be facing the rear wall of the trunk compartment.
3.
Take the 2 ground cables (SBB/N-CHA/GND and INV/N-SBB/N) left loose near the rear wall of
the trunk compartment and connect them to the -ve pole of this battery.
4.
Bring the second battery and lower it into the SBB area making sure it is sitting down flat.
Please Note: Make sure the grounding cable leading to the Grounding Bus Bar does not
obstruct lowering the battery. You could try using masking tape to hold it out of the way.
5.
Tidy up the temperature sensor cable and place the sensors near the second battery's +ve
pole.
6.
Take the 2 short jumper cables (red - SBB/P-JUMP & black - SBB/N-JUMP) and connect the 2
batteries together (Red to the +ve poles and Black to the -ve poles).
7.
CAUTION: Before proceeding make sure all CBs are in the OFF position.
Press the blue button on each CB to disconnect it.
8.
Lastly, connect the thick red colour-coded cable (BEP/SBB-SBB) coming out of the side of the
PD Vertical Panel to the first battery's +ve pole.
Close the trunk floor door. You are now done with the trunk
and can move onto connecting the SCP!