05-1481-00-00.fm
165
Maintenance and servicing
5.1
Maintenance certificate
The following table provides clear information on the maintenance work to
be carried out after a certain number of operating hours.
The proper execution of the work must be confirmed by the authorised
workshop in the following table.
In order for guarantee and warranty claims to be acknowledged, all main-
tenance work must be carried out by an authorised workshop and Hako
GmbH notified accordingly.
In this context, we refer to the warranty regulations of Hako GmbH.
After
operating
hours
Maintenance plan
Date
Operating
hours status
Company/signature
Handover
50
1st inspection
250
2nd inspection
500
A
1,000
B
1,500
A
2,000
B
2,500
A
3,000
B
3,500
A
4,000
B
4,500
A
5,000
B
5,500
A
Содержание Citymaster 2200
Страница 33: ...02 1481 00 00 fm 33 Operation 4 7 8 Fig 2 3 2 1 5 6 13 14 9 10 11 18 19 15 16 17 20 22 24 23 21 25 12 26 27 28...
Страница 35: ...02 1481 00 00 fm 35 Operation Fig 3 34 31 29 32 33 34 35 36 37 30...
Страница 39: ...02 1481 00 00 fm 39 Operation Fig 5 73 74 71 72 72 71 74 75 76 82 83 84 77 78 79 81...
Страница 43: ...02 1481 00 00 fm 43 Operation Fig 7 114 116 117 118 119 120 115 113 112...
Страница 236: ...236 05 1481 00 00 fm Maintenance and servicing...