46
-
Bring the cylinder rep1 against the trolley rep2, then insert the shaft rep3 simultaneously through the
cylinder and the trolley.
-
Lock the shaft with the pin rep4.
The complete cylinder is ready for use (fig.4).
HOOKING
-
Insert the hooking shaft into the upper part of the trolley and lock it with the pin (fig.5).
-
Make sure that the hooking shaft is centred in relation to the trolley (fig.6).
-
Bring the platform against the trolley so that the supports are hooked onto the hooking shaft (fig.7)
-
Lock the platform to the trolley by inserting the clip pins through the holes in the brackets (fig.8).
-
-
-
-
-
-
-
Fig. 3
Fig. 4
Complete
cylinder
Trolley
Shaft
Fig. 5
Fig. 6
Hooking
shaft
Clip
Detailed
image
Fig. 7
Supports
Hooking
shaft
Clip
pins
Fig. 8
Содержание MAXIAL PREMIUM
Страница 14: ...14 SAFETY MARKINGS ON THE MACHINE WINCH BASE LADDER HEADBOARD ACCESSORIES...
Страница 18: ...18 ASSEMBLY EXAMPLES...
Страница 40: ...40 OVERLOAD OF THE DOUBLE TIPPING SKIP MAX PAYLOAD 150kg...
Страница 51: ...51 EXAMPLES OF INCLINED INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 60: ...60 EXAMPLES OF VERTICAL INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 67: ...67 1 1 2 2 2 1 4 4 3 3...
Страница 70: ...70...
Страница 75: ...75...
Страница 86: ...86 ELECTRICAL DIAGRAM OF THE ABM VF 200 250 WINCHES for MAXIAL EXCELLIUM and EXPERT...
Страница 87: ...87 DETAILS OF ELECTRICAL CONNECTIONS TO THE FREQUENCY CONVERTER...