![HAEMMERLIN MAXIAL PREMIUM Скачать руководство пользователя страница 77](http://html1.mh-extra.com/html/haemmerlin/maxial-premium/maxial-premium_instructions-for-use-manual_3177154077.webp)
77
Straighten the rest of the ladder mat so it is vertical and then lay the unit on the ground perpendicular to the
building or rotate to lay the whole unit parallel to the building.
The removal can be done in different ways:
- up to 8m in length, 2 people on the ground can lay down the ladder mat
-
from 8 to 15m long, the ladder mat can be laid down by 2 people on the ground and 1 person
on the roof or
the top of the building site who holds and releases progressively by means of a rope
fixed at the high end of the ladder mat
When the ladders are placed on the ground, unlock and remove all ladder parts, then remove the
accessory trolley from the base ladder.
Alternative solution:
2 or 3 people support the entire ladder mat from the roof or top of the building site by means of a rope
attached to the top end of the ladder mat. 1 person on the ground unlocks and removes the base ladder
with the accessory trolley from below. Then as the lower person unlocks and removes the ladder sections
one after the other, the people on the roof or top of the building site will let the ladder mat descend down to
the ground.
Store all parts of the hoist very carefully so as not to damage them during handling, transport and storage.
We remind you that during all dismantling operations, it is strictly forbidden to access and climb on the
ladder elements as well as on the trolley and its accessories.
The persons who participate in dismantling the hoist from the roof or the top of the site must take the
necessary precautions, i.e. be secured by a railing or safety harness with a fall arrest system and attached
to the building.
It is mandatory to wear a helmet and safety shoes for all persons present on the site, whether or
not they are involved in disassembly operations.
We also remind you that during the disassembly operations, it is mandatory for the people who
dismantle and put away the lifting cable to wear protective gloves and it strongly recommended for all other
workers.
REGULATIONS AND SAFETY INSTRUCTIONS
In the following pages, we remind the user that they are bound to respect a certain number of texts, the
essential points of which are mentioned here.
The Head of the Company shall post at all stations:
- sheets bearing the inscription "Transportation of Persons Prohibited" and giving the
maximum payload according to the type of machine
- an instruction stating:
* the safety measures to be taken during normal operation of the hoist,
* the code of command signals,
* the safety measures to be imposed to ensure maintenance and visits for the machine.
SECURITY OF MOVEMENT AREAS
All workplaces at height must be protected by rails to prevent operators from falling.
Stations must be kept closed when the load is not level. The levels not used and in front of which the load
passes, will have to be closed off with a fence so that no part of the moving elements can reach the
personnel.
It is reminded that it is forbidden:
- to stand in the lifting area under a load being moved or unloaded in
a higher station.
- touching or trying to touch any moving part, rollers, pulleys, cable etc. while the machine
is in operation and its control has not been locked out.
- to step on the ladder or accessories for transporting material.
The danger zone must be delimited by a physical device consisting of two horizontal elements, one of
which should be at a height of between 1 and 1.2m, the other at a height of about 0.5m. These elements
Содержание MAXIAL PREMIUM
Страница 14: ...14 SAFETY MARKINGS ON THE MACHINE WINCH BASE LADDER HEADBOARD ACCESSORIES...
Страница 18: ...18 ASSEMBLY EXAMPLES...
Страница 40: ...40 OVERLOAD OF THE DOUBLE TIPPING SKIP MAX PAYLOAD 150kg...
Страница 51: ...51 EXAMPLES OF INCLINED INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 60: ...60 EXAMPLES OF VERTICAL INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 67: ...67 1 1 2 2 2 1 4 4 3 3...
Страница 70: ...70...
Страница 75: ...75...
Страница 86: ...86 ELECTRICAL DIAGRAM OF THE ABM VF 200 250 WINCHES for MAXIAL EXCELLIUM and EXPERT...
Страница 87: ...87 DETAILS OF ELECTRICAL CONNECTIONS TO THE FREQUENCY CONVERTER...