12
Volume of the platform, vertical with front panel
0.110m3
0.110m3
0.138m3
Base ladder 2m with hinged shoes
Standard profile
Standard profile
Heavy duty profile
Ladder 0.5 m
Standard profile
Standard profile
Heavy duty profile
Ladder 1 m
Standard profile
Standard profile
Heavy duty profile
Ladder 2 m
Standard profile
Standard profile
Heavy duty profile
Knee joint (1.20m)
Pre-welded 30 to
60°
Pre-welded 30 to
60°
Double ply 0 to 60°
Headboard (0.30m)
Yes
Yes
Yes
Fast assembly with quick bolts
Yes
Yes
Yes
The hoisting, shoring and anchoring accessories and additional elements listed in the
catalogue are all optional.
In order to improve its products, HAEMMERLIN reserves the right to make changes to the
materials at any time.
PRECAUTIONS TO BE TAKEN DURING INSTALLATION
-
The assembly area must be marked out and the equipment must be stored properly without
obstructing the movement of third parties and allowing the smooth running of the site.
-
Set up the workstation so that the operator has full visibility of the entire trajectory of the moving
parts. The work area must be well lit to ensure a good view of the entire path of the load to be
hoisted.
-
Make sure that it is not possible to be within five metres of a live power line. Take into account the
length of materials handled and hoisted.
-
Make sure that the ground can support the load at the support point of the hoist when it is at
maximum load. The anchoring must be stable, solid and durable.
-
The hoist shall be installed so that, during ascent or descent, the moving part of the hoist cannot
collide with other moving bodies or with the building or structure against which it is installed.
-
Verify that the length of the lifting cable is greater than twice the height of the high unloading
point and that once the machine is installed with the mobile equipment in the lowered
position, there are at least 3 turns of cable left wound around the winch drum.
Verify the
general condition and the winding of the lifting cable around the drum. It must always be perfectly
wound around the drum to avoid deteriorating. It must be replaced if it shows tears or crushing. It is
strictly forbidden to repair a lifting cable using couplers or cable ties! See the chapter on cable
maintenance on pages 93-94.
GROUND PRESSURE UNDER MAXIMUM LOAD
HEIGHT OF THE
LADDER
MAXIAL
PREMIUM
EXCELLIUM
EXPERT
H10m
387daN
440daN
500daN
H15m
413daN
466daN
529daN
H20m
464daN
516daN
586daN
H30m
567daN
643daN
H40m
700daN
P
Содержание MAXIAL PREMIUM
Страница 14: ...14 SAFETY MARKINGS ON THE MACHINE WINCH BASE LADDER HEADBOARD ACCESSORIES...
Страница 18: ...18 ASSEMBLY EXAMPLES...
Страница 40: ...40 OVERLOAD OF THE DOUBLE TIPPING SKIP MAX PAYLOAD 150kg...
Страница 51: ...51 EXAMPLES OF INCLINED INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 60: ...60 EXAMPLES OF VERTICAL INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 67: ...67 1 1 2 2 2 1 4 4 3 3...
Страница 70: ...70...
Страница 75: ...75...
Страница 86: ...86 ELECTRICAL DIAGRAM OF THE ABM VF 200 250 WINCHES for MAXIAL EXCELLIUM and EXPERT...
Страница 87: ...87 DETAILS OF ELECTRICAL CONNECTIONS TO THE FREQUENCY CONVERTER...