
PART 4
CIRCUIT CONDITION- FINAL TRANSFER TO STANDBY
• When the transfer mechanism’s main load carrying contacts reach “Neutral” position (disconnected from both
power sources), a mechanical interlock opens limit switch LS3. This opens the circuit to actuating coil (C) and
the coil de-energizes.
• With coil (C) de-energized, spring force closes the main contacts to their “Standby” power source side (“Load”
connected to the “Standby” source).
• As the main contacts close to the “Standby” side, a mechanical interlock actuates limit switches XA1/XB1 to
their terminals A1/A2 side. This action “prepares” the circuit for retransfer back to “Utility”.
• Electrical load circuits (T1/T2) are now powered by generator AC output.
Page 70
DC CONTROL
LIQUID COOLED
ENGINE UNITS
SECTION 4.2
OPERATIONAL ANALYSIS
Содержание 4721
Страница 60: ...PART 3 Page 56 V TYPE PREPACKAGED TRANSFER SWITCHES SECTION 3 4 DIAGNOSTIC TESTS...
Страница 98: ...PART 4 Page 94 DC CONTROL LIQUID COOLED ENGINE UNITS SECTION 4 4 DIAGNOSTIC TESTS...
Страница 108: ...Page 104 PART 9 ELECTRICAL DATA V TYPE TRANSFER SWITCH 100 200 AMP 2 POLE DRAWING 0F0015 A 1 of 2...
Страница 109: ...ELECTRICAL DATA V TYPE TRANSFER SWITCH 100 200 AMP 2 POLE PART 9 Page 105 DRAWING 0F0015 A 2 of 2...
Страница 112: ...PART 9 Page 108 ELECTRICAL DATA WIRING DIAGRAM 1 5 LITER LIQUID COOLED ENGINE DRAWING 0E0343 B...
Страница 115: ......