“V-TYPE” PREPACKAGED
TRANSFER SWITCHES
SECTION 3.3
TROUBLESHOOTING FLOW CHARTS
PART 3
Page 49
BAD
BAD
BAD
BAD
BAD
Problem 2 - In Automatic Mode, No Retransfer Back to Utility
TEST 7 - CHECK
VOLTAGE AT
TERMINAL LUGS
N1 & N2
TEST 10 - CHECK
FUSES F1 & F2
TEST 8 - CHECK
VOLTAGE AT
UTILITY 1 AND
UTILITY 2 TERMINALS
TEST 9 - CHECK
VOLTAGE AT
UTILITY CLOSING
COIL C1
TEST 3 - TEST
TRANSFER
RELAY (TR)
TEST 4 - CHECK
MANUAL TRANSFER
SWITCH OPERATION
TEST 11 - TEST LIMIT
SWITCH XA1
TEST 6 - CHECK
WIRING AND WIRING
CONNECTIONS
GOOD BUT NO
TRANSFER
FIND CAUSE OF NO
UTILITY SOURCE
VOLTAGE TO
TRANSFER SWITCH
GOOD
GOOD
GOOD
BAD
BAD
BAD
REPLACE
BLOWN
FUSE(S)
REPLACE BAD RELAY
REPAIR, RECONNECT
OR REPLACE WIRING
GOOD
GOOD
REPLACE UTILITY
CLOSING COIL C1
REPAIR OR REPLACE
DEFECTIVE TRANSFER
MECHANISM PART(S)
REPLACE BAD
LIMIT SWITCH
BAD
BAD
BAD
Problem 3 - In Automatic Mode, Generator Starts and Transfer to Standby Occurs
When Utility Source Voltage is Available
TEST 7 - CHECK VOLTAGE
AT TERMINAL LUGS N1 & N2
TEST 10 - CHECK
FUSES F1 & F2
TEST 8 - CHECK VOLTAGE
AT UTILITY 1 AND
UTILITY 2 TERMINALS
VOLTAGE AT UTILITY 1 AND 2
TERMINALS IN TRANSFER
SWITCH IS GOOD
TEST 6 - CHECK
WIRING AND WIRING
CONNECTIONS
FIND CAUSE OF NO UTILITY SOURCE
VOLTAGE TO TRANSFER SWITCH
AND CORRECT THE PROBLEM
GOOD
GOOD
REPLACE
BLOWN
FUSE(S)
TROUBLESHOOT GENERATOR
DC CONTROL SYSTEM
SEE PART 4 AS APPROPRIATE
Содержание 4721
Страница 60: ...PART 3 Page 56 V TYPE PREPACKAGED TRANSFER SWITCHES SECTION 3 4 DIAGNOSTIC TESTS...
Страница 98: ...PART 4 Page 94 DC CONTROL LIQUID COOLED ENGINE UNITS SECTION 4 4 DIAGNOSTIC TESTS...
Страница 108: ...Page 104 PART 9 ELECTRICAL DATA V TYPE TRANSFER SWITCH 100 200 AMP 2 POLE DRAWING 0F0015 A 1 of 2...
Страница 109: ...ELECTRICAL DATA V TYPE TRANSFER SWITCH 100 200 AMP 2 POLE PART 9 Page 105 DRAWING 0F0015 A 2 of 2...
Страница 112: ...PART 9 Page 108 ELECTRICAL DATA WIRING DIAGRAM 1 5 LITER LIQUID COOLED ENGINE DRAWING 0E0343 B...
Страница 115: ......