M i g h t y M u l e 3 5 2
21
ON/OFF
ON/OFF
Control Board Access Cover
Control Board
Second Battery Harness
Connector (32’)
Communication
Cable (LINK)
ON/OFF Switch
ON/OFF
Step 1
With the SECOND opener mounted in the
upside down position remove the Control
Board Access Panel on the bottom of the
opener arm.
Step 2
Connect the Communication Cable coming
out of the conduit from the Master Opener to
the LINK terminal on the second opener arm
control board. Be sure to leave enough slack
in the cable to accomodate routing of cable
through access panel.
Step 3
Run the end of the Second Battery Harness
Cable up to the Second Opener and plug it
into the battery harness terminal on the control
board.
DO NOT
connect the other end of the
Battery Harness cable at this point.
Step 4
IMPORTANT:
Make sure the power switch on
the opener arm is in the OFF position.
Master Opener
Second Opener
At this point your gate openers should be connected like the picture below.
Attaching Second Opener Battery and Communication Cables