Figure 5
7. Start threading pump into bearing housing (M).
When pin holes align, insert pin. Pull retaining
wire clip down.
8. Continue threading pump into bearing housing
(M) until top threads are +/- 1/16 in. (2 mm) of
bearing face (N). Ensure that barbed fittings at
wet-cup flush ports are accessible.
9. Connect component A outlet tube loosely at
pump and at heater. Line up tube, then tighten
fittings securely.
10. Tighten star-shaped locknut (G) by hitting firmly
with a non-sparking hammer.
11. Apply thin film of TSL to barbed fittings. Using
two hands, support tubes (T) while pushing
straight onto barbed fittings. Secure each tube
with a wire tie between two barbs.
Note
Do not let tubes kink or buckle.
12. Reconnect fluid inlet (C).
13. Purge air and prime the system. See Reactor
operation manual.
Repair Drive Housing
Removal
1. Press
to stop the pumps.
2. Turn off heat zones.
3. Flush pump.
4. Press
to park the pumps in the down position.
5. Press
to deactivate the system.
6. Turn main power switch off.
50
333024A
Содержание Reactor 2 E-30
Страница 69: ...Parts Parts Proportioners 333024A 69...
Страница 82: ...Parts Electrical Enclosure 82 333024A...
Страница 90: ...Electrical Schematics Available Circuit Breakers Part Amps 126128 20 126131 40 24L960 50 90 333024A...
Страница 91: ...Electrical Schematics 1 16U529 16V515 15D906 24U855 1 Locate near TCM 333024A 91...