Installation
12
3A6165J
Installation
Grounding
EFR:
grounded through the power cord (customer sup
-
plied).
Fluid supply containers:
follow local code.
Object being dispensed:
follow local code.
Solvent pails used when flushing:
follow local code.
Use only conductive metal pails, placed on a grounded
surface. Do not place the pail on a nonconductive
surface, such as paper or cardboard, which interrupts
grounding continuity.
To maintain grounding continuity when flushing or
relieving pressure:
hold metal part of the dispense
valve firmly to the side of a grounded metal pail, then
trigger the dispense valve.
Power Requirements
The system requires a dedicated circuit protected with a
circuit breaker.
Connect Power
1. Cut power cord wires to the following lengths:
•
Ground wire - 6.5 inches (16.5 cm)
•
Power wires - 3.0 inches (7.6 cm)
•
Add ferrules as necessary. See F
. 5.
2. Remove the four screws to separate the junction
box cover (BA) and disconnect switch (C) from the
junction box (BB) on the electrical driver.
All electrical wiring must be done by a qualified elec
-
trician and comply with all local codes and regula
-
tions.
The equipment must be grounded to reduce the risk
of static sparking and electric shock. Electric or static
sparking can cause fumes to ignite or explode.
Improper grounding can cause electric shock.
Grounding provides an escape wire for the electric
current.
Voltage
Phase
Hz
Current
200-240 VAC
1
50/60
20 A
400-480 VAC
1
50/60
10 A
F
IG
. 5: Power Cord
F
IG
. 6: Remove Junction Box Cover
LQ
LQ
WLD
BB
BA
C