![GORBEL AL 1000 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/gorbel/al-1000/al-1000_installation-operation-and-maintenance-manual_2244884006.webp)
STEP 2 - HANGER INSTALLATION (CONTINUED)
Perpendicular Flush Mount
2.5
For trussed track:
Position spine clamp angles (or plates) so they are centered under top tube of runway at
hanger locations. Bolt spine clamp angle (or plate) and top hanger brackets together
leaving maximum amount of threaded rod available above top hanger bracket for
installation of beam clips (
diagram 2E
).
Position runway top tube flush and perpendicular to building support beam. Bolt top
hanger brackets and beam clips to support beam. Torque nuts (
chart 2A,
page 2, for
proper torque rating).
Note:
Flange thickness may vary and require shimming. Shimming may be needed to
assure that the beam clip hardware is vertical. Refer to Step 3, on page 5, for
further runway installation instructions.
WARNING
Threaded rod must have a minimum of two threads beyond hexnut.
WARNING
“Center hole” of top hanger brackets must be centered on building support beam.
Diagram 2E.
Installing Perpendicular Flush Mounted Hangers on trussed track.
4
9/05
Trussed track with 1-1/2” to 2-1/2” top tube.
Trussed track with 3” to 6” top tube.
Содержание AL 1000
Страница 1: ......