STEP 8 - FESTOONING INSTALLATION (CONTINUED)
Festoon Trolleys
If you have a monorail go to Step 8.11.
8.7
For 250-500 series track:
Remove end stop on festooning end
of bridge.
8.8
Roll festoon trolleys through open
end of
bridge
that corresponds with
festooning on runway. Space festoon
trolleys every 3’-0” along bridge.
Note:
Every 6’-0” for vacuum hose
festooning.
8.9
Slide festoon clamp/vacuum hose
clamp into place at festooning end of
bridge and tighten clamp bolt
(
diagrams 8A
,
page 18
,
or
8B
).
8.10
Re-install end stop (molded bumper
with through bolt) in festooning end
of bridge (
diagram 8C
).
8.11
For 250-500 series track:
Remove end stop from festoon stack
section/festooning end of
runway/monorail.
8.12
Roll festoon trolleys into end of
runway/monorail/festoon stack
section track (on festooning side of
runway/monorail). Space festoon
trolleys every 6’0” along
runway/monorail, between bridge
and festoon stack section.
8.13
Slide festoon clamp into end of
runway/monorail/festoon stack
section and tighten clamp bolt
(
diagram 8A
,
page 18
,
or
8B
).
8.14
For 250 or 500 series track:
Re-install end stop in runway/monorail/festoon stack section (
diagram 8C
).
TIP:
Before installing festoon trolleys in 250 and 500 series track, the molded bumper (on
festooning end of bridge runway) must first be removed.
Æ
Diagram 8B.
Installing vacuum hose clamp on runway or
bridge.
Diagram 8C.
Installing end stop on
runway/monorail/festoon stack section.
19
9/05