TS200
21. When the system detects the DOWN switch
closed, the display will show "LOWER LOADED"
with the current height (from 100% to 0%)
22. Again after a delay, the system will stop the
platform lower and take height & pressure
measurements; the display will show
"MEASURING #xx"
A.
i) When the measurements have been taken,
the platform will resume lowering
23. The lowering ... stopping ... measuring ...
lowering process will continue until the platform
is fully lowered.
24. When the platform is fully lowered (and height
0% is displayed), release the DOWN switch; the
display shows "TOTAL DATA: xx" to indicate the
number of measurements taken
25. The load calibration "LOADED" phase is now
complete
26. The display will show "REDO EMPTY? YES" -
for the first time calibration only "YES" can be
selected
A.
Press the ENTER button to confirm that
empty calibration is needed
27. The display will show "PLATFORM EMPTY?",
asking for confirmation that the platform is
empty
A.
Remove all load from the platform then press
the ENTER button to confirm
28. The display will show "PLEASE LIFT ... ", waiting
for the UP switch to be activated to begin raising
the platform
A.
Close the UP switch and keep it closed until
the platform has reached full height
B.
When the system detects the UP switch
closed, the display will show "LIFT EMPTY"
with the current height (from 0% to 100%)
C. Similar to the "LIFT LOADED" phase the
lifting ... stopping ... measuring ... lifting
process will continue until the platform
reaches full height, then the UP switch can be
released
D. The display shows "TOTAL DATA: xx" to
indicate the number of measurements taken
29. The display will show "PLEASE LOWER ... "
A.
Close the DOWN switch and keep it closed
until the platform is fully lowered
Section 5 - Procedures
B.
Similar to the "LOWER LOADED" phase
the lowering ... stopping ... measuring ...
lowering process will continue until the
platform is fully lowered, then the DOWN
switch can be released
C.
The display shows "TOTAL DATA: xx" to
indicate the number of measurements taken
30. The load calibration "EMPTY" phase is now
complete
31. The collected data is checked to ensure that
there were no problems with the recorded
pressure; checks include making sure that the
loaded pressures are higher than the empty
pressures, with sufficient difference to enable
load estimates to be calculated
32. The display will show "CALDATE: mm/dd/yy"
with the "mm" value flashing
A.
It is recommended that the current date
be entered here to provide easy tracking
of the date of last calibration (the date can
be seen in the "LOG" menu available in the
"DIAGNOSTICS" menu)
B.
Use
J
and
t
to set the month, then press
➔ to move to the date; set the date and
then the year in the same way
C.
Press ENTER to complete date entry (the
system will store it)
33. The display will show "FINISHED!"
IMPORTANT
Press the ESC button to exit the "CALIBRATE
LOAD" option (it's not possible to use the machine
if you don't do this)
34. The TS200 is now fully calibrated
65
1330ED
&
1530ED micro
GMG
Содержание 1330-ED
Страница 4: ...Notes 4 1330ED 1530ED micro GMG...
Страница 24: ......
Страница 25: ...Section 2 Maintenance Tables and Diagrams 25 1330ED 1530ED micro GMG...
Страница 31: ...Section 3 System Component Identification and Schematics 31 1330ED 1530ED micro GMG...
Страница 38: ...Notes 1330ED 1530ED micro GMG...
Страница 69: ...Notes 69 1330ED 1530ED micro GMG...