Installation
7
GBF Ventless Electric Fryer
GBF-35D & 50D-VH
• Fryers must be properly grounded in accordance with local code, or in the absence of local code, with the
National Electrical Code, ANSI/NFPA 70
.
Improper grounding may result in electrical shock to Users. Check
local electrical code to ensure that proper grounding techniques are used.
•
Always consult a certified electrician, or other qualified service technician, prior to installation to ensure that
electrical circuits are of sufficient rating for the appliance load.
•
GBF-D-VH Fryers
are manufactured for the various Voltage/Hz/Phase shown on
Table 2.04.1
below. Check the
Serial/Data Label inside the Cabinet or attached to the Rear Panel to determine the proper electrical service
required for the Unit.
2.03
Electrical Requirements
2.04
Electrical Specifications
Voltage
Phase Hz
Watts
Amps
Circuit Breaker Required
L1
L2
L3
208
3
60
18,000
54
54
54
65
240
3
60
18,000
47
47
47
55
380
3
60
15,000
27
27
27
35
415
3
60
18,600
29.5
29.5
29.5
35
1. As needed, install appropriate circuit breaker(s) in main electrical panel. See
Section 2.04
.
2.
Recommend
that a disconnect switch box be installed between main panel and Fryer.
3. Connect 1-1/4” flexible conduit from disconnect (or breaker panel) to the Fryer. Attach conduit to rear of the
Fryer Service Box with appropriate conduit fittings. Allow enough length so that the Fryer can be moved easily
for cleaning and servicing. See
Figure 2.05.1
.
4. Open Fryer Cabinet Door and remove Service Box Cover. See
Figure 2.05.1
.
5. Connect an appropriate ground wire between the Ground Lug and a proper earth ground.
6. Route appropriately sized power wires from the disconnect box (or breaker panel) through to the front Service
Box of the Fryer.
7. Connect the supply power wires to Distribution Block located in the Service Box. See
Figure 2.05.1
.
8. Reinstall Service Box Cover.
NOTE:
Electrical installation materials (breakers, conduit, fittings, wire, etc.) and installation labor shall be supplied by
the customer. Work should be performed by a qualified professional electrical contactor.
Installation must comply with all local code requirements. Giles is not responsible for code compliance with
regard to installation and use of this appliance.
2.05
Electrical Connections
Содержание GBF Series
Страница 2: ......
Страница 4: ......
Страница 12: ...x Safety GBF Ventless Electric Fryer GBF 35D 50D VH ...
Страница 16: ...4 Introduction GBF Ventless Electric Fryer GBF 35D 50D VH ...
Страница 32: ...20 Overview GBF Ventless Electric Fryer GBF 35D 50D VH 5 6 2 4 1 3 7 3 03 Lower Cabinet ...
Страница 36: ...24 Overview GBF Ventless Electric Fryer GBF 35D 50D VH 2 1 3 7 4 5 6 8 3 05 Ventless Hood ...
Страница 48: ...36 Pre Operation GBF Ventless Electric Fryer GBF 35D 50D VH ...
Страница 110: ...98 Troubleshooting GBF Ventless Electric Fryer GBF 35D 50D VH ...
Страница 118: ...106 Parts List GBF Ventless Electric Fryer GBF 35D 50D VH 9 05 Lower Cabinet Rear 8 3 1 10 4 5 6 7 2 5 9 ...
Страница 122: ...110 Parts List GBF Ventless Electric Fryer GBF 35D 50D VH Not shown 9 07 Ventless Hood Front 8 3 1 4 5 6 7 2 ...
Страница 126: ...114 Parts List GBF Ventless Electric Fryer GBF 35D 50D VH A 9 09 Filter Pan 8 3 1 4 5 6 7 2 10 9 ...
Страница 128: ...116 Parts List GBF Ventless Electric Fryer GBF 35D 50D VH ...
Страница 129: ......