25
Make sure that the equipment is depressurized,
cooled down to room temperature and free from
fluid.
To reduce the pressure through the bore in the
cover slowly loosen the sealing plug by two
turns (10).
Remove the cap nut (1).
Remove the outer gasket (26) from the
adjustment screw.
Remove the hexagon nut (25).
Remove the inner gasket (26) from the
adjustment screw.
Screw out the upper adjustment screw (11) until
a resistance is felt.
Turn the upper adjustment screw (11) by the
required number of turns.
Содержание TK 23
Страница 1: ...Steam Trap for Large Condensate Flowrates TK 23 TK 24 Original Installation Instructions 819309 01 ...
Страница 56: ...56 Capacity Charts Capacity chart for hot water A Flowrate B Differential pressure Δ PMX ...
Страница 57: ...57 Capacity chart for cold water A Flowrate B Differential pressure Δ PMX ...
Страница 62: ...62 ...
Страница 63: ...63 ...