39
NRG 1x-60 - Installation & Operating Manual -
819681-00
Bringing into service
Before bringing into service, check that all equipment is correctly connected:
■
■
Is the polarity of the CAN bus control line correct throughout?
■
■
Is a 120 Ω terminating resistor connected to the terminal devices of the CAN bus line?
Next, switch on the supply voltage.
Changing the factory settings if necessary
You will need the following tools
■
■
Slotted screwdriver, size 2.5